4
leakage above the benches. If not enough care has been taken when assembling the side modules,
there is a risk that a crack could occur in the thin part of the inner tongue. In such cases, the risk of
leakage above the joint between the benches and side module is high, and almost always there is
then a leakage in the side stave tongue, which makes water drip in the lower end. Find the crack and
resolve it promptly according to chapter “
Preparing the side modules
”.
Mounting insulation and side panels
After the leakage test has been made, the mounting of the insulation and side panels can begin. Note
the place for the first side insulation, pictures
30
/
P
and
31
/
R
. If the bubble system air connection
has not been mounted yet, do it now. See picture
30
/
O
for placement. Mount the side insulation so
that the upper edge is at the same height as the side modules and fasten the panel. Use a part of the
edge in order to get the panel and the insulation at the same height as the side module, picture
31
.
Follow the measurements shown in picture
31
/
R
. HINT! Nail small nails in the side modules, 4 pcs
for each insulation sheet, which makes it easy to fasten the side insulation, picture
30/P
. Before
putting the covering shelf in place, the control system level indicator must be mounted. See separate
instructions concerning this. Assemble the rim, picture
35
,
36
,
37
. HINT! Use silicone around
the holes and screws. This is just to make sure that no water can get in the hole
,
picture
35/1/5
. Do
the same where the brown
protection covers
for the screws will be put on, picture
37
. Before
mounting the rim please put some masking tape 1 cm beneath the upper edge of the tub. When the
rim has been mounted, apply some sealing compound between thios and the side wall and smooth it
out. When finished you can take off the masking tape.
Turn the tub so that it is lying on its side (put something soft underneath) and mount the base
insulation. See page 19, picture
38
och
39
. Fix the bottom insulation inside the box before the
technical parts get installed. The gap between the box’s insulated sides and tub needs to be filled
with a insulation foam, picture
42
.
The hot tub is now ready for use.
Remember that water hygiene is important and follow our recommendations concerning this. We
hope you thoroughly enjoy your spa bath!
Summary of Contents for AquaKing
Page 8: ...The same principle is used for all parts that will be joined and coated 1 2 3 4 5 6 20mm 20mm ...
Page 9: ...9 10 11 7 8 12 5mm 10mm ...
Page 17: ... Gäller endast om du har AquaKing Jets Only applies if you have AquaKing Jets 1 2 3 4 5 6 ...
Page 18: ......
Page 19: ...The pictures show the installation of the temperature sensor ...