PNI GreenHouse SC3500 User Manual Download Page 48

17 

 

charging current 

 

6KW48V 

1-80A 

8KW48V 

1-100A 

10KW48V 

1-120A 

12KW48V 

1-140A 

 
 
 
 

14 

 
 
 
 
Battery type 

AGM (default)                                           

                                     

Flooded 

 

GEL                                                             

 

                                     

LEAD 

 

Lithium Ion                                               

                                         

User-Defined 

 

If  "User-Defined"  LI  is  selected,  battery  charge  voltage  and  low  DC  cut-off 
voltage can be set up in program 17, 18 and 19. 

 
 
 
 
 

17 

 
 
 
 
 
Bulk charging voltage 
(C.V voltage) 

24V model default setting: 28.2V 

 

     
If  "User-Defined"  LI  is  selected  in  program  14,this  program  can  be  set  up. 
Setting range is from 24.0V to 29.2V for 24Vdc model. Increment of each click 
is 0.1V   
48V model default setting: 56.4V 

 

If  self-defined  is  selected  in  program  14,  this  program  can  be  set  up.  Setting 
range is from 48.0V to 58.4V for 48Vdc model. Increment of each click is 0.1V. 

 
 
 
 
 

18 

 
 
 
 
 
Floating 

charging 

voltage 

24

V model default setting: 27.0V 

 

If  "User-Defined"  LI  is  selected  in  program  14,  this  program  can  be  set  up, 
Setting range is from 24.0V to 29.2V for 24Vdc model. Increment of each click 
is 0.1V 
48V model default setting: 54.0V 

 

If  self-defined  is  selected  in  program  14,  this  program  can  be  set  up,  Setting 
range is from 48.0V to 58.4V for 48Vdc model. Increment of each click is 0.1V. 

 
 
 

19 

 
 
 
Low  DC  cut  off  battery 
voltage setting 

24V model default setting: 20.4V 

 

If  "User-Defined"  LI  is  selected  in  program  14,  this  program  can  be  set  up. 
Setting range is from 20.0V to 24.0V for 24Vdc model. Increment of each click 
is 0.1V. Low DC cut-off voltage will be fixed to setting value no matter what 
percentage of load is connected. 
48V model default setting: 40.8V 

 

Summary of Contents for GreenHouse SC3500

Page 1: ...PNI GreenHouse SC3500 Manual de utilizare 6KW 48V MPPT...

Page 2: ...ri de baterii poate duce la ranirea personala si la daune aduse proprietatii 3 Nu dezasamblati unitatea In caz de defectiune apelati la un centru service specializat Reasamblarea incorecta poate duce...

Page 3: ...ioritate incarcare solara sau AC configurabila prin ecranul LCD Compatibil cu tensiunea de retea sau cu puterea generatoarelor Controller incarcare solara MPPT 80A Protectie la suprasarcina supraincal...

Page 4: ...Power saver 2 Ecran LCD 3 Indicatro status 4 Indicator descarcare incarcare 5 Indicator eroare 6 Butoane functii 7 Port control de la distanta 8 BAT 9 FAN 10 BAT 11 Port WI FI 12 Port de comunicare U...

Page 5: ...nici o componenta a invertorului sa nu fie deteriorata la transport Continutul pachetului Invertor x 1 Manual de utilizare x 1 Cablu USB x 1 Software CD x 1 Linie BTS Line x 1 optional Cheie WIFI x 1...

Page 6: ...deconectare In unele aplicatii ar putea sa nu fie necesara instalarea unui dispozitiv de deconectare in orice caz este recomandat sa instalati o protectie la cupracurent ATENTIONARE Toate conexiunile...

Page 7: ...te de cel putin 400Ah pentru un invertor de 4KW 6KW DC48V si cu o capacitate de cel putin 600Ah pentru un invertor de 8KW 12KW NOTE folositi doar baterii cu plumb acid sau baterii GEL AGM 3 Introducet...

Page 8: ...AC Model Calibru Valoarea cuplului 4KW 5KW 10AWG 1 4 1 6Nm 6KW 8KW 8AWG 1 4 1 6Nm 10KW 12KW 2 10AWG 1 6 1 8Nm Urmati pasii de mai jos pentru a efectua conexiune de intrare iesire AC 1 Inainte de a efe...

Page 9: ...RE Toate conexiunile trebuie efectuate de personal calificat AVERTIZARE Este foarte important pentru siguranta sistemului si pentru o functionare corecta sa folositi cablurile recomandate pentru conex...

Page 10: ...i polaritatea cablurilor conectate Apoi conectati polul pozitiv a cablului de conexiunea la polul pozitiv a conectorilor de intrare PV Conectati polul negativ a cablului de conexiunea la polul megativ...

Page 11: ...PCS 48V 200A 3S7P 2 21PCS 2 Schema instalare panouri solare Asamblare finala Dupa ce ati conectat toate cablurile puneti la loc capacul invertorului si fixati l in suruburi Conexiuni linii de comunica...

Page 12: ...tare inactiva este redus semnificativ Control de la distanta In afara de panoul de control de pa partea frontala a invertorului un panou de control conectat la portul RJ 11 pe partea DC a invertorului...

Page 13: ...e baterie Setare valoare in Program 21 sau bateria atinge stadiul floating de incarcare Inchis Panoul de control Panoul de control afisat mai jos se afla pa partea din fata a invertorului Include 3 in...

Page 14: ...ii baterie Indica nivelul bateriei 0 24 25 49 50 74 si 75 100 in mod baterie si starea de incarcare in mod linie In mod AC va indica stadiul de incarcare a bateriei Status Tensiune baterie Ecran LCD M...

Page 15: ...elula Informatii incarcare Indica supraincarcare Indica nivelul de incarcare 0 24 25 49 50 74 si 75 100 0 24 25 49 50 74 75 100 Informatii mod functionare Indica conectarea la retea Indica conectarea...

Page 16: ...consumatorii in mod prioritar Daca tensiunea bateriei este mai mare decat nivelul setat in programul 21 timp de 5 minute dar energia solara a fot disponibila in aceste 5 minute invertorul va trece pe...

Page 17: ...ioritara Energia solara va incarca bateria prioritar Reteaua va incarca bateria doar daca nu este disponibila energia solara Solar si Retea default Energia solara si reteaua vor incarca bateria in ace...

Page 18: ...e la 48 0V la 58 4V pt 48Vdc Cresterea cu fiecare click este de 0 1V 18 Tesniune incarcare Floating Setare implicita model 24V 27 0V Daca Definit de utilizator LI este selectat in programul 14 acest p...

Page 19: ...click este de 0 1V 22 Rotire automata pagina default Daca este selectat pe ecran se va roti automat pagina afisata Daca este selectat pe ecran va ramane pe ultimul mod accesat de utilizator 23 Control...

Page 20: ...ul este de la 5 min la 900min Cresterea cu fiecare click este de 5min 35 Interval egalizare baterie 30zile default Intervalul este de la 0 la 90 zile Cresterea cu fiecare click este de 1 zi 36 Activar...

Page 21: ...te prea mica 05 Scurtcircuit pe iesire 06 Tensiunea de iesire a invertorului este prea mare 07 Timp de suprasarcina 08 Tensiunea magistralei invertorului este prea mare 09 Eroare pornire soft 11 Eroar...

Page 22: ...ea a invertorului 51 Eroare protectie supracurent 52 Tensiunea magistralei invertorului este prea mica 53 Eroare pornire sift invertor 55 Tensiune DC mare pe iesirea AC 56 Conexiunea bateriei este des...

Page 23: ...re Descriere Ecran LCD Utility Tie state Energia solara incarca bateria iar reteaua ofera energie consumatorilor AC PV este pornit PV este oprit Charge state Energia PV si reteaua alimenteaza bateria...

Page 24: ...ta retea frecventa invertor tensiune PV putere incarcare PV tensiune de iesire incarcare PV curent de incarcare PV Invertorul alimenteaza consumatorii doar de la baterie Stop state Invertorul se opres...

Page 25: ...50Hz 60Hz Auto detection Low Loss Frequency 40HZ 1HZ APL UPS GEN Low Loss Return Frequency 42HZ 1HZ APL UPS GEN High Loss Frequency 65HZ 1HZ APL UPS GEN High Loss Return Frequency 63HZ 1HZ APL UPS GE...

Page 26: ...44 0VDC 21 4Vdc 42 8VDC Atentionare tensiune DC scazuta load 20 20 load 50 load 50 20 2Vdc 40 4VDC 23 0Vdc 46 0VDC 22 4Vdc 44 8VDC Atentionare tensiune DC de retur load 20 20 load 50 load 50 21 2Vdc...

Page 27: ...e AGM Gel LEAD Battery 28 8Vdc 57 6Vdc Flooded Battery 28 4Vdc 56 8Vdc Charging Algorithm 3 Step Flooded Battery AGM Gel Battery 4 Step LI Solar Charging Mode INVERTER MODEL 4KW24V 5KW24V 4KW48V 5KW48...

Page 28: ...R 4KW24V 5KW24V 4KW48V 5KW48V 6KW48V 8KW48V 10KW48V 12KW48V Certificare CE Interval temperatura de lucru 0 C to 40 C Temperatura depozitare 25 C 60 C Dimensiuni D W H mm 745X505X370mm 884X618X443mm Gr...

Page 29: ...29...

Page 30: ...USER S MANUAL SOLAR INVERTER CHARGER MPPT 4KW 12KW...

Page 31: ...Output Connection 7 PV Connection Error Bookmark not defined Final Assembly 10 commuication connection 10 OPERATION 11 Power ON OFF 11 Operation and Display Panel 12 LCD Display Icons 13 LCD setting...

Page 32: ...d service center when service or repair is required Incorrect re assembly may result in a risk of electric shock or fire 4 To reduce risk of electric shock disconnect all wirings before attempting any...

Page 33: ...tting Configurable AC Solar Charger priority via LCD setting Compatible to mains voltage or generator power MPPT solar charge controller 80A Overload Over temperature short circuit protection Smart ba...

Page 34: ...ower saver on off switch 2 LCD display 3 Status indicator 4 Discharging Charging indicator 5 Fault indicator 6 Function buttons 7 Remote control port 8 BAT 9 FAN 10 BAT 11 WI FI port 12 USB communicat...

Page 35: ...e package is damaged You should have received the following items inside of package The unit x 1 User manual x 1 USB cable x 1 Software CD x 1 BTS Line x 1 Option WIFI Key x 1 Option Remote Line x 1 O...

Page 36: ...disconnect device in some applications however it s still requested to have over current protection installed Please refer to typical amperage in below table as required fuse or beaker size WARNING Al...

Page 37: ...600Ah capacity battery for 8KW 12KW model NOTE Please only use sealed lead acid battery or sealed GEL AGM lead acid battery 3 Insert the ring terminal of battery cable into battery connector of inver...

Page 38: ...able size as below Suggested cable requirement for AC wires Model Gauge Torque Value 4KW 5KW 10AWG 1 4 1 6Nm 6KW 8KW 8AWG 1 4 1 6Nm 10KW 12KW 2 10AWG 1 6 1 8Nm Please follow below steps to implement A...

Page 39: ...V modules WARNING All wiring must be performed by a qualified personnel WARNING It s very important for system safety and efficient operation to use appropriate cable for PV module connection To reduc...

Page 40: ...Check correct polarity of connection cable from PV modules and PV input connectors Then connect positive pole of connection cable to positive pole of PV input connector Connect negative pole of conne...

Page 41: ...P 2 21PCS 2 Solar panel installation schematic Final Assembly After connecting all wirings please put bottom cover back by screwing two screws as shown below Communication Connection Please use suppli...

Page 42: ...ents thus the idle consumption is significantly reduced Remote control Apart from the switch panel on the front of the inverter an switch panel connected to the RJ 11 port at the DC side of the invert...

Page 43: ...ery charging reaches floating stage Close Operation and Display Panel The operation and display panel shown in below chart is on the front panel of the inverter It includes three indicators four funct...

Page 44: ...Information Indicates battery level by 0 24 25 49 50 74 and 75 100 in battery mode and charging status in line mode In AC mode it will present battery charging status Status Battery voltage LCD Displa...

Page 45: ...dicates overload Indicates the load level by 0 24 25 49 50 74 and 75 100 0 24 25 49 50 74 75 100 Mode Operation Information Indicates unit connects to the mains Indicates unit connects to the PV panel...

Page 46: ...to the loads as first priority If battery voltage has been higher than the setting point in program 21 for 5 minutes and the solar energy has been available for 5 minutes too the inverter will turn to...

Page 47: ...r energy will charge battery as first priority Utility will charge battery only when solar energy is not available Solar and Utility default Solar energy and utility will charge battery at the same ti...

Page 48: ...58 4V for 48Vdc model Increment of each click is 0 1V 18 Floating charging voltage 24V model default setting 27 0V If User Defined LI is selected in program 14 this program can be set up Setting rang...

Page 49: ...ach click is 0 1V 22 Auto turn page default If selected the display screen will auto turn the display page If selected the display screen will stay at latest screen user finally switches 23 Backlight...

Page 50: ...Increment of each clink is 5min 35 Equalization interval 30days default Setting range is from 0 to 90days Increment of each clink is 1 day 36 Equalization activated immediately Enable Disable default...

Page 51: ...e is too high 04 Battery voltage is too low 05 Output short circuited 06 Inverter output voltage is high 07 Overload time out 08 Inverter bus voltage is too high 09 Bus soft start failed 11 Main relay...

Page 52: ...ncy 44 Inverter grid over frequency 51 Inverter over current protection error 52 Inverter bus voltage is too low 53 Inverter soft start failed 55 Over DC voltage in AC output 56 Battery connection is...

Page 53: ...CD display Utility Tie state PV energy is charger into the battery and utility provide power to the AC load PV is on PV is off Charge state PV energy and grid can charge batteries Bypass state Error a...

Page 54: ...inverter frequency PV voltage PV charging power PV charging output voltage PV charging current Inverter power loads from battery only Stop state The inverter stop working if you turn off the inverter...

Page 55: ...50Hz 60Hz Auto detection Low Loss Frequency 40HZ 1HZ APL UPS GEN Low Loss Return Frequency 42HZ 1HZ APL UPS GEN High Loss Frequency 65HZ 1HZ APL UPS GEN High Loss Return Frequency 63HZ 1HZ APL UPS GEN...

Page 56: ...ge load 20 22 0Vdc 44 0VDC 20 load 50 21 4Vdc 42 8VDC load 50 20 2Vdc 40 4VDC Low DC Warning Return Voltage load 20 23 0Vdc 46 0VDC 20 load 50 22 4Vdc 44 8VDC load 50 21 2Vdc 42 4VDC Low DC Cut off Vo...

Page 57: ...AGM Gel LEAD Battery 28 8Vdc 57 6Vdc Flooded Battery 28 4Vdc 56 8Vdc Charging Algorithm 3 Step Flooded Battery AGM Gel Battery 4 Step LI Solar Charging Mode INVERTER MODEL 4KW24V 5KW24V 4KW48V 5KW48V...

Page 58: ...ODEL 4KW24V 5KW24V 4KW48V 5KW48V 6KW48V 8KW48V 10KW48V 12KW48V Safety Certification CE Operating Temperature Range 0 C to 40 C Storage temperature 25 C 60 C Dimension D W H mm 745X505X370mm 884X618X44...

Page 59: ...are flashing Battery is disconnected Check if battery wires are connected well Buzzer beeps continuously and red LED is on Fault code 07 Overload error The inverter is overload 110 and time is up Redu...

Page 60: ...29 USER S MANUAL SOLAR INVERTER CHARGER...

Reviews: