![PNI GreenHouse SC3500 User Manual Download Page 47](http://html1.mh-extra.com/html/pni/greenhouse-sc3500/greenhouse-sc3500_user-manual_1569955047.webp)
16
04
Output frequency
05
Solar supply priority
Solar energy provides power to charge battery as first
priority.
(default)
Solar energy provides power to the loads as first priority.
06
Overload bypass: When
enabled, the unit will
transfer to line mode if
overload
occurs
in
battery mode.
Bypass disable
Bypass enable
(default)
07
Auto
restart
when
overload occurs
Restart disable
(default)
Restart enable
08
Auto restart when over
temperature occurs
Restart disable
(default)
Restart enable
10
Charger source priority:
To configure charger
source priority
If this inverter/charger is working in Line, Standby or Fault mode, charger
source can be programmed as below:
Solar first
Solar energy will charge battery as first
priority. Utility will charge battery only when
solar energy is not available.
Solar and Utility (default)
Solar energy and utility will charge battery at
the same time.
Only Solar
Solar energy will be the only charger source
no matter utility is available or not
.
If this inverter/charger is working in Battery mode or Power saving mode, only
solar energy can charge battery. Solar energy will charge battery if it's available
and sufficient.
11
Maximum charging
current: To configure
total charging current for
solar and utility
chargers.(Max. charging
current=utility charging
csolar charging
current)
80A (default)
4KW24V
1-160A
5KW24V
1-180A
4KW48V
1-140A
5KW48V
1-150A
6KW48V
1-160A
8KW48V
1-200A 1-300A
10KW48V
1-220A 1-320A
12KW48V
1-240A 1-340A
13
Maximum
utility
30A (default)
4KW24V
1-80A
5KW24V
1-100A
4KW48V
1-60A
5KW48V
1-70A