0000112606/010720/A ControlPro
6
If the number exceeds 8 cables (excluding the mains cord),
you must install additional cable glands. In that case, do the
following.
• Loosen the pneumatic hoses (B) from the bulkhead
connectors from the inside of the Panel.
• Loosen and remove the bottom plate (C+D).
• Open the necessary number of knock-out holes
16
(A).
• Put additional cable glands M16 (E) in the bottom plate and
tighten them.
• Install the bottom plate.
• Fasten the pneumatic hoses to the bulkhead connectors.
WARNING
You must remove the bottom plate to put additional
cable glands to avoid damage to the interior parts of
the Panel.
C
B (4x)
C (6x)
D
E
A
B
C
B (4x)
C (6x)
D
E
A
B
C
B (4x)
C (6x)
D
E
A
B
Fig. 4.5 Additional cable glands (optional)
4.3.2 ControlPro/HMI
To install the HMI, do the following.
• Loosen the locking screw (C) and the HMI (B) from the
bracket (A).
• Install the bracket to the wall. Use all 3 mounting points
and make sure that it is level.
• Put the HMI on the bracket.
16. Max. 10
Fig. 4.6
A
B
C
Mounting of the HMI
• Attach the HMI with the locking screw (A).
• Connect the HMI cable (C) to the CAN connector (B) and
tighten it.
Fig. 4.7
A
C
D
B
Locking screw and HMI cable
Optional:
•
Connect the supplied ethernet field connector (B) to the
ethernet cable (A).
• Remove the dust cap (refer to Fig. 4.7D) and put the
ethernet cable in the corresponding LAN port.
Fig. 4.8
A
B
Ethernet field connector
4.4
Electric connection
This chapter describes the electric connection of all
necessary and optional components to the Panel.
Depending on the specific configuration of the filter system,
some of the connections on the PC board inside the Panel
remain unused. The PC board contains detachable screw
terminal blocks (“connectors”).
on page 21 gives an overview of the necessary and
optional cables
17
that you need to install the system.
17.
Recommended cable specifications; use cables with a max. wire diameter 1,5
mm² (AWG 16)