background image

Model XX0598

ECN2218

Page 13 of 14

Installation Instructions

Spring

•  Inspect the spring to insure they are properly secured 

to the anchor and spring plates. Check spring U-bolts to 
ensure secure connections. If any damage is detected, 
barricade equipment to prevent use until repair is 
completed. Contact your sales representative immediately 
for a replacement part.

Plastic Parts

•  Inspect all plastic surfaces for sharp points, cracks 

or jagged edges. If any damage is detected and is 
determined to be unsafe, barricade equipment to prevent 
use until repair is completed. Minor burrs or sharp edges 
may be removed by using a sharp utility knife or block 
plane to remove sharp burr.

Fasteners

•  Inspect for loose fasteners. Tightening torque specifi cations 

are: 

  Bolts and Nuts:  Snug tighten and tighten an additional 

one-half turn.

•  Inspect for missing, worn or broken fasteners. If any 

missing, worn or broken fasteners are found, refer to the 
installation instructions for proper replacement fastener. 
If any damage is detected, barricade equipment to 
prevent use until repair is completed. Contact your sales 
representative immediately for a replacement part.

•  If during the maintenance process a bolt needs to be 

removed from a part or parts, it will be necessary to apply 
a drop of liquid thread lock / loctite to the bolt before 
reinstallation.

Welds

•  Inspect all welded joints. If any broken welds are detected, 

barricade equipment to prevent use until repair is 
completed. Contact your sales representative immediately 
for a replacement part.

Equipment Maintenance 

Playworld Systems

®

Model XX0598

Quattro See-Saw

(w/ Seat Backs) 

Castings

•  Visually inspect handles and end caps for cracks or 

breakage. If any damage is detected, barricade equipment 
to prevent use until repair is completed. Contact your sales 
representative immediately for a replacement part.

Finish

•  Inspect metal parts for fi nish damage. 
   

To repair painted surfaces, sand damaged area with 

sandpaper and wipe clean. Mask area and paint with 
primer and allow to dry. Paint primed area with color-
matching paint and allow to dry. Recoat area with color-
matching paint if required. Drying time is approximately 
8 hours between coats.

Footings

•  Inspect component to be securely attached to the spring 

and solid in the footing. If any damage is detected, 
barricade equipment to prevent use until repair is 
completed.

Surfacing

•  Refer to the specifi c surfacing maintenance detail sheet 

for additional information.

Replacement Parts

•  Refer to your installation instructions to obtain replacement 

part number.

•  Contact your sales representative or call Playworld 

Systems’ Customer Service for replacement part.

1000 Buffalo Road • Lewisburg, PA  17837

www.playworldsystems.com

For Customer Service, Call

    

 

800-233-8404 or

               570-522-9800 

OUTSIDE U.S.

Summary of Contents for XX0598

Page 1: ... 155 5 Kilos Concrete Required 0 24 cubic yard 0 18 cubic meter Use Zone Refer to Use Zone information User Group ages ASTM CSA 2 12 yrs EN 2 14 yrs Assembly View A Use Zones Quattro See Saw A ASTM 84 in 2134 mm CSA 2100 mm EN 1500 mm Weights are approximate for determining manpower ICON KEY Fully Tighten Hardware Add 1 Drop of Thread Locking Adhesive Do Not Fully Tighten Hardware Pour Concrete Dr...

Page 2: ...ker with line or factory applied mark designating protective surfacing level on a clear and level installation site If play structure is installed on uneven terrain maintain support post mark at protective surfacing level at lowest grade Adjust other footings accordingly Support posts and all attaching decks and play components must be plumb and level Do not encase bottom of support post in concre...

Page 3: ...218 Page 3 of 14 Installation Instructions Footing Diagram Elevation View Top View Surfacing Warning Label Apply The Surface Warning Labels Here 17 8 452 mm KEY Position Unit of Measurement Top Inches Bottom Millimeters ...

Page 4: ...x Nut w Locking Ring BAE0621 3 8 Flat Washer BAE0595 1 25 O D Flat Washer BAE0690 1 2 Hex Lock Nut BAE0720 Spring Wedge AAU0062 Spring ATM0014 3 8 x 2 U bolt BAE0028 1 2 x 2 94 U Bolt BAE1574 Base Frame AFR1087 3 8 Hex Nut w Locking Ring BAE0621 3 8 Flat Washer BAE0595 Note Arrange spring as shown in Detail A 2 Ensure that the 1 1 2 U bolt is lined up with the outer two holes on the side of the mo...

Page 5: ...Model XX0598 ECN2218 Page 5 of 14 Installation Instructions Detail D Step 7 Pivot Assembly ASY0256 3 8 x 3 4 Button Head Bolt BAE0659 3 8 Flat Washer BAE0595 Base Frame AFR1087 ...

Page 6: ...062 Spring ATM0014 Detail E 2 Step 8 See Saw Frame AFR1438 Detail E 3 Step 8 1 2 x 2 94 U Bolt BAE1574 See Notes over at the right Note Arrange spring as shown in Detail D 3 Ensure that the 2 94 U bolt is lined up with the outer two holes on the side of the mounting plate Bottom View of the frame Important Note The 2 94 U bolt attaches through the spring wedge then the 2 U bolt over the second and...

Page 7: ...on Head Bolt BAE0666 3 8 Lock Nut BAE0620 3 8 Flat Washer BAE0595 3 8 Flat Washer BAE0595 Plastic Trim BFC1017 Left BFC1018 Right See Saw Frame 3 8 Flat Washer BAE0595 1 Bolts only Detail G 1 Step 10 Detail G 2 Step 10 See Saw Frame AFR1438 Cover Panel BFC0489 Cover Panel BFC0489 See Saw Frame AFR1438 3 8 x 1 1 4 Button Head Bolt BAE0666 3 8 I D x 1 1 4 O D Fender Washer BAE0936 ...

Page 8: ... Installation Instructions Detail I Step 12 3 8 x 1 1 4 Button Head Bolt BAE0666 See Saw Frame Handle Side Panel BFC0488 Detail J Step 13 3 8 x 1 1 2 Button Head Bolt BAE06645 3 8 Flat Washer BAE0595 Handle AAU0086 3 8 Lock Nut BAE0620 ...

Page 9: ...on Head Bolt BAE0664 3 8 Lock Nut BAE0620 3 8 Flat Washer BAE0595 Seat Cover BFC0487 3 8 Flat Washer BAE0595 3 8 Flat Washer BAE0595 3 8 Lock Nut BAE0620 Detail L Step 15 Seat Mounting Bracket 3 8 x 1 Button Head Bolt BAE0664 3 8 Lock Nut BAE0620 3 8 Flat Washer BAE0595 Seat Cover BFC0487 3 8 Flat Washer BAE0595 ...

Page 10: ... it is plumb and level after pouring the concrete Attach the pivot assembly to the base frame __Step 7 Attach the pivot assembly to the base frame See Detail D Select the pivot assembly and the appropriate hardware There are 12 twelve connections Position the pivot assembly down over the sides of the frame align the holes apply a drop of thread locking adhesive to the bolt threads and attach as sh...

Page 11: ...p 13 Attach the handles to the side panels See Detail J Select 8 eight handles and the appropriate hardware There are 32 thirty two connections Position each handle between the top or bottom of each pair of side panels and make attachments as shown Attach the seat covers to the seat mounting bracket __Step 14 Attach the seat covers to the seat mounting bracket See Detail K Select 4 four seat cover...

Page 12: ...BOLT 3 8 16 x 3 4 BUTTON HEAD SS 12 BAE0664 BOLT 3 8 16 x 1 BUTTON HEAD SS 32 BAE06645 BOLT 3 8 16 x 1 1 2 BUTTON HEAD SS 32 BAE0666 BOLT 3 8 16 x 1 1 4 BUTTON HEAD SS 76 BAE06673 BOLT 3 8 16 x 2 BUTTON HEAD SS 2 BAE06681 BOLT 3 8 16 x 3 BUTTON HEAD SS 12 BAE0690 WASHER 531 I D x 1 250 O D x 060 THICK 8 BAE0720 NUT 1 2 13 LOCK 8 BAE0910 TOOL 1 4 SHORT HEX KEY WRENCH 1 BAE0922 TOOL TT 45 L WRENCH 2...

Page 13: ...d lock loctite to the bolt before reinstallation Welds Inspect all welded joints If any broken welds are detected barricade equipment to prevent use until repair is completed Contact your sales representative immediately for a replacement part Equipment Maintenance Playworld Systems Model XX0598 Quattro See Saw w Seat Backs Castings Visually inspect handles and end caps for cracks or breakage If a...

Page 14: ...se Print __________________________________ Signature ________________________________________ Date ___ ___ ___ MAINTENANCE SCHEDULE Item in Question Description of Problem Corrective Action Date Inspector Name Please Print __________________________________ Signature _________________________________________ Date ___ ___ ___ Inspection Codes P Pass F Fail NA Not Applicable INSPECTION CHECKLIST Fr...

Page 15: ...e For rocking springing equipment intended for standing the use zone should extend on all sides a minimum distance of 1500 mm Site layout is a critical part of the overall installation Footings must be measured and marked accurately according to the footing diagram A level and clear installation site is ideal Good drainage around the structure and its supports is important Inquire with local contr...

Page 16: ...el alignment tool 3 8 ratchet with 9 16 socket and 9 16 combination wrench Maintenance Inadequate maintenance of equipment has resulted in injuries on the playground Because the safety of playground equipment and its stability depends on good inspection and maintenance a comprehensive maintenance program must be developed for each playground and strictly followed All equipment must be inspected fr...

Page 17: ...ight dimensions Height measurements are taken from the top of the protective surfacing material Insure all fasteners are tightened according to tightening torque specifications listed on your installation instructions Insure all exposed pipe ends have properly installed end caps Insure that drive rivets are secure Clean dried concrete off of components and any other affected surface Touch up any s...

Reviews: