background image

Model XX0598

ECN2218

Page 10 of 14

Installation Instructions

__

Notes Before You Begin:

 Do not over tighten bolts during assembly, only snug 

tighten them unless otherwise instructed. 

Carefully read and understand these installation instructions before you 
begin.
__Step 1:

 Before attempting to assemble your equipment, please review all 

installation information carefully. Should you experience any diffi culty during the 
installation process, please call us at the telephone number shown on the last 
page of these instructions.

__Step 2:

 Separate and identify all components and hardware. 

___Step 3:

 Excavate footings as shown in the 

Support Post Footing Details

 

on 

page 2 

of this document.

Attach the spring to the base frame.
__Step 4:

 Attach the spring to the base frame. See 

Details A and B

. Select 

the base frame, the spring and the appropriate hardware. There are (3) three 
connections. Lower the spring onto the base frame. Insert the spring wedge into 
the end of the spring coil and rotate around until tight. Insert the U-bolts over the 
spring and attach as shown. 

Note:

 The 2.94" U-bolt attaches through the spring wedge, then the 2" U-bolt over 

the second and bottom coil, and the 1-1/2" U-bolt over the bottom coil. 

Note: 

Repeat the procedure in 

Step 4

 to attach a second spring to the opposite 

end of the base frame.

Attach the base plate to the base frame. 
__Step 5: 

Attach the base plate to the base frame. See 

Detail C

.  Select the base 

plate and the appropriate hardware. There are (2) two connections. Raise the 
base plate below the base frame and attach through the center of the spring as 
shown. Fully tighten the hardware according to tightening torque specifi cations 
in 

Step 16

 of these instructions.  

__Step 6:

 Place the base frame into the prepared footing. Plumb and level the 

assembly. Fully tighten all fasteners according to tightening torque specifi cations 
in 

Step 16

 of these instructions. Block and brace for concrete. Pour concrete 

and allow 72 hours for concrete to completely cure before continuing on with the 
installation. Check the frame to ensure that it is plumb and level after pouring 
the concrete.

Attach the pivot assembly to the base frame. 
__Step 7:

  Attach the pivot assembly to the base frame. See 

Detail D

. Select the 

pivot assembly and the appropriate hardware. There are (12) twelve connections. 
Position the pivot assembly down over the sides of the frame, align the holes, 
apply a drop of thread locking adhesive to the bolt threads, and attach as shown. 
Do not fully tighten the connections. 

Attach the see-saw frame to the springs.
__Step 8: 

 Attach the see-saw frame to the springs. See 

Details E-1, E-2, and 

E-3

. Select the see-saw frame, the spring wedges, and the appropriate hardware. 

There are (3) three connections per spring, (6) six total connections. Position the 
see-saw frame with the fl at side of the spring mounting plate facing down and 
over top of the springs. Insert a spring wedge between the end and next spring 
coil on the end of a spring and rotate around until it is tight. The tabs should be 
on the top, next to the end coil. Position frame so the legs of the U-bolt stick up 
through the holes in the spring mounting plate. Fully tighten connections according 
to tightening torque specifi cations.  See 

Step 16

 of these instructions. Repeat 

procedure to attach the frame to the other spring.

Note:

 The 2.94" U-bolt attaches through the spring wedge, then the 2" U-bolt over 

the second and bottom coil, and the 1-1/2" U-bolt over the bottom coil.

Attach the see-saw frame to the pivot assembly.
__Step 9:

  Attach the frame to the pivot assembly. See 

Detail F

. Select the 

appropriate hardware. There are (12) twelve connections. Align the holes in the 
side of the frame with the holes in the pivot assembly and attach as shown. Fully 
tighten the connections according to tightening torque specifi cations. See 

Step 

16

 of these instructions.

Attach the cover panel to the frame.
__Step 10: 

 Attach the cover panel to the frame. See 

Detail G-1 and G-2

. Select 

the cover panel and the appropriate hardware. There are (4) four connections. 
Place the cover panel on top of the frame and align the holes. The side of the 
panel that has the routed out holes must be facing up. Apply a drop of thread 
locking adhesive to the bolt threads and insert each bolt through the panel and 
thread into the frame. Fully tighten the connections.

Summary of Contents for XX0598

Page 1: ... 155 5 Kilos Concrete Required 0 24 cubic yard 0 18 cubic meter Use Zone Refer to Use Zone information User Group ages ASTM CSA 2 12 yrs EN 2 14 yrs Assembly View A Use Zones Quattro See Saw A ASTM 84 in 2134 mm CSA 2100 mm EN 1500 mm Weights are approximate for determining manpower ICON KEY Fully Tighten Hardware Add 1 Drop of Thread Locking Adhesive Do Not Fully Tighten Hardware Pour Concrete Dr...

Page 2: ...ker with line or factory applied mark designating protective surfacing level on a clear and level installation site If play structure is installed on uneven terrain maintain support post mark at protective surfacing level at lowest grade Adjust other footings accordingly Support posts and all attaching decks and play components must be plumb and level Do not encase bottom of support post in concre...

Page 3: ...218 Page 3 of 14 Installation Instructions Footing Diagram Elevation View Top View Surfacing Warning Label Apply The Surface Warning Labels Here 17 8 452 mm KEY Position Unit of Measurement Top Inches Bottom Millimeters ...

Page 4: ...x Nut w Locking Ring BAE0621 3 8 Flat Washer BAE0595 1 25 O D Flat Washer BAE0690 1 2 Hex Lock Nut BAE0720 Spring Wedge AAU0062 Spring ATM0014 3 8 x 2 U bolt BAE0028 1 2 x 2 94 U Bolt BAE1574 Base Frame AFR1087 3 8 Hex Nut w Locking Ring BAE0621 3 8 Flat Washer BAE0595 Note Arrange spring as shown in Detail A 2 Ensure that the 1 1 2 U bolt is lined up with the outer two holes on the side of the mo...

Page 5: ...Model XX0598 ECN2218 Page 5 of 14 Installation Instructions Detail D Step 7 Pivot Assembly ASY0256 3 8 x 3 4 Button Head Bolt BAE0659 3 8 Flat Washer BAE0595 Base Frame AFR1087 ...

Page 6: ...062 Spring ATM0014 Detail E 2 Step 8 See Saw Frame AFR1438 Detail E 3 Step 8 1 2 x 2 94 U Bolt BAE1574 See Notes over at the right Note Arrange spring as shown in Detail D 3 Ensure that the 2 94 U bolt is lined up with the outer two holes on the side of the mounting plate Bottom View of the frame Important Note The 2 94 U bolt attaches through the spring wedge then the 2 U bolt over the second and...

Page 7: ...on Head Bolt BAE0666 3 8 Lock Nut BAE0620 3 8 Flat Washer BAE0595 3 8 Flat Washer BAE0595 Plastic Trim BFC1017 Left BFC1018 Right See Saw Frame 3 8 Flat Washer BAE0595 1 Bolts only Detail G 1 Step 10 Detail G 2 Step 10 See Saw Frame AFR1438 Cover Panel BFC0489 Cover Panel BFC0489 See Saw Frame AFR1438 3 8 x 1 1 4 Button Head Bolt BAE0666 3 8 I D x 1 1 4 O D Fender Washer BAE0936 ...

Page 8: ... Installation Instructions Detail I Step 12 3 8 x 1 1 4 Button Head Bolt BAE0666 See Saw Frame Handle Side Panel BFC0488 Detail J Step 13 3 8 x 1 1 2 Button Head Bolt BAE06645 3 8 Flat Washer BAE0595 Handle AAU0086 3 8 Lock Nut BAE0620 ...

Page 9: ...on Head Bolt BAE0664 3 8 Lock Nut BAE0620 3 8 Flat Washer BAE0595 Seat Cover BFC0487 3 8 Flat Washer BAE0595 3 8 Flat Washer BAE0595 3 8 Lock Nut BAE0620 Detail L Step 15 Seat Mounting Bracket 3 8 x 1 Button Head Bolt BAE0664 3 8 Lock Nut BAE0620 3 8 Flat Washer BAE0595 Seat Cover BFC0487 3 8 Flat Washer BAE0595 ...

Page 10: ... it is plumb and level after pouring the concrete Attach the pivot assembly to the base frame __Step 7 Attach the pivot assembly to the base frame See Detail D Select the pivot assembly and the appropriate hardware There are 12 twelve connections Position the pivot assembly down over the sides of the frame align the holes apply a drop of thread locking adhesive to the bolt threads and attach as sh...

Page 11: ...p 13 Attach the handles to the side panels See Detail J Select 8 eight handles and the appropriate hardware There are 32 thirty two connections Position each handle between the top or bottom of each pair of side panels and make attachments as shown Attach the seat covers to the seat mounting bracket __Step 14 Attach the seat covers to the seat mounting bracket See Detail K Select 4 four seat cover...

Page 12: ...BOLT 3 8 16 x 3 4 BUTTON HEAD SS 12 BAE0664 BOLT 3 8 16 x 1 BUTTON HEAD SS 32 BAE06645 BOLT 3 8 16 x 1 1 2 BUTTON HEAD SS 32 BAE0666 BOLT 3 8 16 x 1 1 4 BUTTON HEAD SS 76 BAE06673 BOLT 3 8 16 x 2 BUTTON HEAD SS 2 BAE06681 BOLT 3 8 16 x 3 BUTTON HEAD SS 12 BAE0690 WASHER 531 I D x 1 250 O D x 060 THICK 8 BAE0720 NUT 1 2 13 LOCK 8 BAE0910 TOOL 1 4 SHORT HEX KEY WRENCH 1 BAE0922 TOOL TT 45 L WRENCH 2...

Page 13: ...d lock loctite to the bolt before reinstallation Welds Inspect all welded joints If any broken welds are detected barricade equipment to prevent use until repair is completed Contact your sales representative immediately for a replacement part Equipment Maintenance Playworld Systems Model XX0598 Quattro See Saw w Seat Backs Castings Visually inspect handles and end caps for cracks or breakage If a...

Page 14: ...se Print __________________________________ Signature ________________________________________ Date ___ ___ ___ MAINTENANCE SCHEDULE Item in Question Description of Problem Corrective Action Date Inspector Name Please Print __________________________________ Signature _________________________________________ Date ___ ___ ___ Inspection Codes P Pass F Fail NA Not Applicable INSPECTION CHECKLIST Fr...

Page 15: ...e For rocking springing equipment intended for standing the use zone should extend on all sides a minimum distance of 1500 mm Site layout is a critical part of the overall installation Footings must be measured and marked accurately according to the footing diagram A level and clear installation site is ideal Good drainage around the structure and its supports is important Inquire with local contr...

Page 16: ...el alignment tool 3 8 ratchet with 9 16 socket and 9 16 combination wrench Maintenance Inadequate maintenance of equipment has resulted in injuries on the playground Because the safety of playground equipment and its stability depends on good inspection and maintenance a comprehensive maintenance program must be developed for each playground and strictly followed All equipment must be inspected fr...

Page 17: ...ight dimensions Height measurements are taken from the top of the protective surfacing material Insure all fasteners are tightened according to tightening torque specifications listed on your installation instructions Insure all exposed pipe ends have properly installed end caps Insure that drive rivets are secure Clean dried concrete off of components and any other affected surface Touch up any s...

Reviews: