Playworld Systems Unity XX0139S Installation Instructions Manual Download Page 14

Installation Instructions

Models XX0193 and XX0193S

ECN2716

Page 14 of 14

Inspection Form

•  Be sure that you are using a copy of this Inspection Form and not your original. 
•  Use  the  Inspection  Codes  listed  below  and  record  condition  of  equipment  at  time  of 

examination on the Inspection Checklist.

•  Document any item from the Inspection Checklist that will require maintenance along with 

any corrective action on the Maintenance Schedule.

•   Be sure to include appropriate dates and signatures on each section to properly document 

maintenance procedure.

Preventive Maintenance 
           

. . . for Safety's Sake!

Repairer:  Name 

(Please Print)

 __________________________________    Signature:________________________________________   Date:___ /___ 

/___

MAINTENANCE SCHEDULE

Item in Question

Description of Problem

Corrective Action

Date

Inspector: Name 

(Please Print)

 __________________________________    Signature:_________________________________________   Date:___ /___ /___

Inspection Codes

= Pass

     F

 = Fail

NA

 = Not Applicable

INSPECTION CHECKLIST

Frequency

Inspection

Code     Date

Date Repairs 

Completed

Inspect plastic parts for damage.

Medium

Inspect spring connections for tightness.

High

Inspect metal parts for structural and fi nish damage.

Medium

Inspect for loose, missing, worn, or broken fasteners.

High

Inspect footing to insure support is secure and footing is not damaged.

Low

Inspect surfacing to insure proper depth and distribution.

High

Summary of Contents for Unity XX0139S

Page 1: ...rs Concrete Required 0 39 cubic yard 0 30 cubic meters Use Zone Refer to the information below User Group Age years ASTM CSA 2 12 EN 2 14 Assembly View representative structure Equipment Use Zone A AS...

Page 2: ...ation Instructions Models XX0193 and XX0193S ECN2716 Page 2 of 14 Top View Elevation Views XX0193 In Ground Footing Diagram 19 3 491 mm KEY Position Unit of Measurement Top Inches Bottom Millimeters 6...

Page 3: ...tructions Models XX0193 and XX0193S ECN2716 Page 3 of 14 Elevation Views XX0193S Surface Mount Top View KEY Position Unit of Measurement Top Inches Bottom Millimeters Footing Diagram 1 25 2 7 216 685...

Page 4: ...ost mark at protective surfacing level at lowest grade Adjust other footings accordingly Support posts and all attaching decks and play components must be plumb and level Do not encase bottom of suppo...

Page 5: ...neven terrain maintain support post mark at protective surfacing level at lowest grade Adjust other footings accordingly Support posts and all attaching decks and play components must be plumb and lev...

Page 6: ...3 Total 3 8 Hex Nut w Locking Ring BAE0621 18 Total 1 O D Flat Washer BAE0600 18 Total Anchor Frame AFR1701 1 Total 3 8 x 3 25 U Bolt BAE1798 3 Total 3 8 x 2 50 U Bolt BAE0029 3 Total 3 8 x 1 75 U Bol...

Page 7: ...ach the sheet plastic and plate to the frame Detail D Step 7 Attach the hub casting to the assembly 3 8 x 2 1 4 Button Head Bolt BAE06675 3 Total Spring Wedge Casting AAU0062 3 Total Detail B 1 Step 5...

Page 8: ...Total 3 8 Lock Nut BAE0620 6 Total 3 8 x 1 Button Head Bolt BAE0664 12 Total 1 O D Flat Washer BAE0600 6 Total Right Perf Sheet BPM0323 6 Total Detail E 1 Step 8 Attach the Right Perf Sheets to the fr...

Page 9: ...1 Button Head Bolt BAE0664 6 Total 3 8 Flat Washer BAE0595 6 Total Casting Cover AAU0844 1 Total 3 8 x 1 Button Head Bolt BAE0664 18 Total 1 O D Flat Washer BAE0600 18 Total Handhold AAU0845 6 Total D...

Page 10: ...rf sheets to the frame See Details E 1 and E 2 Select the six Right Perf Sheets BPM0323 align the holes on the top and bottom of the sheet with the frame and align the right side of the sheets with th...

Page 11: ...RF SHEET RIGHT 6 ALB0025 LABEL AGE APPROPRIATE SHEET 1 1000 Buffalo Road Lewisburg PA 17837 www playworldsystems com For Customer Service Call 800 233 8404 or 570 522 9800 OUTSIDE U S XX0193S UNITY RO...

Page 12: ...Installation Instructions Models XX0193 and XX0193S ECN2716 Page 12 of 14 This page is intentionally left blank...

Page 13: ...nts If any broken welds are detected barricade equipment to prevent use until repair is completed Contact your sales representative immediately for a replacement part Equipment Maintenance Playworld S...

Page 14: ...e Please Print __________________________________ Signature ________________________________________ Date ___ ___ ___ MAINTENANCE SCHEDULE Item in Question Description of Problem Corrective Action Dat...

Page 15: ...e designated play surface or seating surface must be 700 mm or less from the level of the protective surfacing This use zone may be overlapped by the use zones of adjacent play equipment See diagram E...

Page 16: ...also need shovel digging iron post hole digger steel rake wheelbarrow garden hoe water hose tape measure level alignment tool 3 8 ratchet with 9 16 socket and 9 16 combination wrench Maintenance Inad...

Page 17: ...t dimensions Height measurements are taken from the top of the protective surfacing material Insure all fasteners are tightened according to tightening torque specifications listed on your installatio...

Reviews: