Playworld Systems Unity XX0139S Installation Instructions Manual Download Page 13

Installation Instructions

Models XX0193 and XX0193S

ECN2716

Page 13 of 14

Fasteners

•  Inspect for loose fasteners. 
  Tightening torque specifi cations are: 
  Bolts and Nuts:  Snug tighten and tighten an additional 

one-half turn.

•  If  during  the  maintenance  process  a  bolt  needs  to  be 

removed from a part or parts, it will be necessary to apply 
a drop of liquid thread lock to the bolt before reinstallation.

•  Inspect  for  missing,  worn  or  broken  fasteners.  If  any 

missing, worn or broken fasteners are found, refer to the 
installation instructions for proper replacement fastener. 
If  any  damage  is  detected,  barricade  equipment  to 
prevent use until repair is completed. Contact your sales 
representative immediately for a replacement part.

Plastic Parts

•  Inspect  all  plastic  surfaces  for  sharp  points,  cracks 

or  jagged  edges.  If  any  damage  is  detected  and  is 
determined to be unsafe, barricade equipment to prevent 
use until repair is completed. Minor burrs or sharp edges 
may be removed by using a sharp utility knife or block 
plane to remove sharp burr.

Castings

•  Inspect the aluminum castings to insure they are properly 

secured to the component.

•  Visually inspect the castings for cracks or breakage. If 

any  damage  is  detected,  barricade  the  equipment  to 
prevent use until repair is completed. Contact your sales 
representative immediately for a replacement part.

Welds

•  Inspect all welded joints. If any broken welds are detected, 

barricade  equipment  to  prevent  use  until  repair  is 
completed. Contact your sales representative immediately 
for a replacement part.

Equipment Maintenance 

Playworld Systems

®

Models XX0193 and XX0193S

Unity Rocker

Finish

•  Inspect metal parts for fi nish damage. 
     To  repair  painted  surfaces,  sand  damaged  area  with 

sandpaper  and  wipe  clean.  Mask  area  and  paint  with 
primer  and  allow  to  dry.  Paint  primed  area  with  color-
matching paint and allow to dry. Recoat area with color-
matching paint if required. Drying time is approximately 
8 hours between coats.

   To  repair  the  perf  sheet  coating,  contact  the  Playworld 

Systems’  Customer  Service  Department  for  a  coating 
repair touch-up kit.

Springs

•  Inspect the springs to insure they are properly secured to 

the anchor and frames. Check spring U-bolts to ensure 
secure connections. If any damage is detected, barricade 
equipment  to  prevent  use  until  repair  is  completed. 
Contact  your  sales  representative  immediately  for  a 
replacement part.

Footings

•  Inspect component to be solid in footing and secure. If 

any damage is detected, barricade equipment to prevent 
use until repair is completed.

Surfacing

•  Refer to the specifi c surfacing maintenance detail sheet 

for additional information.

Replacement Parts

•  Refer to your installation instructions to obtain replacement 

part number.

•  Contact  your  sales  representative  or  call  Playworld 

Systems’ Customer Service for a replacement part.

1000 Buffalo Road • Lewisburg, PA  17837

www.playworldsystems.com

For Customer Service, Call

    

 

800-233-8404 or

               570-522-9800 

OUTSIDE U.S.

Summary of Contents for Unity XX0139S

Page 1: ...rs Concrete Required 0 39 cubic yard 0 30 cubic meters Use Zone Refer to the information below User Group Age years ASTM CSA 2 12 EN 2 14 Assembly View representative structure Equipment Use Zone A AS...

Page 2: ...ation Instructions Models XX0193 and XX0193S ECN2716 Page 2 of 14 Top View Elevation Views XX0193 In Ground Footing Diagram 19 3 491 mm KEY Position Unit of Measurement Top Inches Bottom Millimeters 6...

Page 3: ...tructions Models XX0193 and XX0193S ECN2716 Page 3 of 14 Elevation Views XX0193S Surface Mount Top View KEY Position Unit of Measurement Top Inches Bottom Millimeters Footing Diagram 1 25 2 7 216 685...

Page 4: ...ost mark at protective surfacing level at lowest grade Adjust other footings accordingly Support posts and all attaching decks and play components must be plumb and level Do not encase bottom of suppo...

Page 5: ...neven terrain maintain support post mark at protective surfacing level at lowest grade Adjust other footings accordingly Support posts and all attaching decks and play components must be plumb and lev...

Page 6: ...3 Total 3 8 Hex Nut w Locking Ring BAE0621 18 Total 1 O D Flat Washer BAE0600 18 Total Anchor Frame AFR1701 1 Total 3 8 x 3 25 U Bolt BAE1798 3 Total 3 8 x 2 50 U Bolt BAE0029 3 Total 3 8 x 1 75 U Bol...

Page 7: ...ach the sheet plastic and plate to the frame Detail D Step 7 Attach the hub casting to the assembly 3 8 x 2 1 4 Button Head Bolt BAE06675 3 Total Spring Wedge Casting AAU0062 3 Total Detail B 1 Step 5...

Page 8: ...Total 3 8 Lock Nut BAE0620 6 Total 3 8 x 1 Button Head Bolt BAE0664 12 Total 1 O D Flat Washer BAE0600 6 Total Right Perf Sheet BPM0323 6 Total Detail E 1 Step 8 Attach the Right Perf Sheets to the fr...

Page 9: ...1 Button Head Bolt BAE0664 6 Total 3 8 Flat Washer BAE0595 6 Total Casting Cover AAU0844 1 Total 3 8 x 1 Button Head Bolt BAE0664 18 Total 1 O D Flat Washer BAE0600 18 Total Handhold AAU0845 6 Total D...

Page 10: ...rf sheets to the frame See Details E 1 and E 2 Select the six Right Perf Sheets BPM0323 align the holes on the top and bottom of the sheet with the frame and align the right side of the sheets with th...

Page 11: ...RF SHEET RIGHT 6 ALB0025 LABEL AGE APPROPRIATE SHEET 1 1000 Buffalo Road Lewisburg PA 17837 www playworldsystems com For Customer Service Call 800 233 8404 or 570 522 9800 OUTSIDE U S XX0193S UNITY RO...

Page 12: ...Installation Instructions Models XX0193 and XX0193S ECN2716 Page 12 of 14 This page is intentionally left blank...

Page 13: ...nts If any broken welds are detected barricade equipment to prevent use until repair is completed Contact your sales representative immediately for a replacement part Equipment Maintenance Playworld S...

Page 14: ...e Please Print __________________________________ Signature ________________________________________ Date ___ ___ ___ MAINTENANCE SCHEDULE Item in Question Description of Problem Corrective Action Dat...

Page 15: ...e designated play surface or seating surface must be 700 mm or less from the level of the protective surfacing This use zone may be overlapped by the use zones of adjacent play equipment See diagram E...

Page 16: ...also need shovel digging iron post hole digger steel rake wheelbarrow garden hoe water hose tape measure level alignment tool 3 8 ratchet with 9 16 socket and 9 16 combination wrench Maintenance Inad...

Page 17: ...t dimensions Height measurements are taken from the top of the protective surfacing material Insure all fasteners are tightened according to tightening torque specifications listed on your installatio...

Reviews: