16
Predrill –
1
/
8
" Dia. for #8 x 2
1
/
2
" deck screws
3
/
8
" Dia. for
3
/
8
" x 5" hex bolts
Position Roof Assembly so both sides of roof overhang tower posts
equally. Secure top corners with two #8 x 2
¹⁄x
" deck screws, then
³|₈
" x 5" hex bolt,
³|₈
" washers and
³|₈
" lock nuts.
See Bolt & Screw Placement Detail
Items for
STEP 15
:
(1) Roof Assembly
(2)
³|₈
" x 5" hex bolts
(4)
³|₈
" washers
(2)
³|₈
" lock nuts
(4) #8 x 2
¹⁄x
" deck screws
Bolt & Screw
Placement Detail
Secure these corners
Items for
STEP 16
:
(2)
³|₈
" x 5" hex bolts
(4)
³|₈
" washers
(2)
³|₈
" lock nuts
(4) #8 x 2
¹⁄x
" deck screws
Predrill –
1
/
8
" Dia. for #8 x 2
1
/
2
" deck screws
3
/
8
" Dia. for
3
/
8
" x 5" hex bolts
Bolt & Screw
Placement Detail
Secure these corners
Rotate tower 180º as shown. Verify the unattached side of the
roof overhangs the tower posts equally. Secure the other two
corners with #8 x 2
¹⁄x
" deck screws, then
³|₈
" x 5" hex bolt,
³|₈
"
washers and
³|₈
" lock nuts.
Note: Tower is shown
with hole on top and
board on bottom