THESE TWO HOLE LOCATIONS
WILL BE EMPTY ON YOUR SWING
BEAM. LINE THEM UP WITH THE
HOLES IN THE SWING LEG
BRACKET UNDER THE SWING BEAM.
STEP 23: REST SWING BEAM ON FORT
*TWO PEOPLE ARE REQUIRED FOR THIS STEP
1: LAY THE SWING BEAM ACROSS THE TOP OF THE FORT RAILINGS.THE END OF THE SWING BEAM WITH TWO EMPTY
HOLES SHOULD OVERHANG THE SIDE OF THE FORT WITH THE TRIANGULAR SWING BEAM PLATE.
2: SIT THE SWING BEAM LEGS UPRIGHT UNDER THE TWO EMPTY HOLES IN THE END OF THE SWING BEAM.
62