Playcore DERO BIKE DEPOT Manual Download Page 7

www.dero.com     |     1-888-337-6729

© 2018 Dero

BIKE DEPOT

Installation Instructions - Panels

Anchor the lower door stops to the concrete with 
(2) 3/8 x 3” wedge anchors and (2) Penta nuts 
in place of the hex nuts.  The lower door stops 
should be directly below the upper door stops 
and just contact the door when it’s closed.  The left 
and right lower door stop may be placed slightly 
off to accommodate some distortion in the doors. 

Attach the door lock bar to the right door with (8) ¼ x 
3” carriage bolts, (4) front door stops, (4) spacers, (8) 
washers, (4) tube clamps,  and (8) nylock nuts.  Once 
bolts are tightened the lock bar should rotate freely.

Attach the latch assembly and cover with (6) 3/8 
x 1” security bolts, and (6) 3/8” washers.  The latch 
assembly can be laterally positioned so the lock bar 
strike enters and exits the latch smoothly.

Fill the (8) 3/8” holes in the left door with (8) ¼ x 
2.5” carriage bolts, (8) lock washers, and (8) nuts.

8

10

11

9

Line up top and bottom door stops

1/4” Nylock Nut

Tube Clamp

Door Lock Bar

1/4” Washer

Spacer

Front Door Stop

.25 x 3” Carriage Bolt

Summary of Contents for DERO BIKE DEPOT

Page 1: ...Parts List 5 4 2 1 3 A B C D UPRIGHT BACK WELDMENT TRUSS WELDMENT UPRIGHT FRONT WELDMENT PURLIN WELDMENT TYPE S DECK 2 5 X 5625 1 2 3 4 5 12 1 4 SELF DRILL SCREWS 4 1 2 BOLTS 4 1 2 BOLTS 4 1 2 DIA SIMPSON STRONG BOLT 2 ANCHORS 3 5 MIN EMBEDMENT A B C D ...

Page 2: ...nry Bits 3 8 1 2 BIKE DEPOT Installation Instructions Main Structure C C D D 0 4 6 PAD THICKNESS 1 0 FOOTING BOTTOM 8 5 8 REBAR 9 5 8 REBAR 0 3 4 1 1 1 9 2 6 3 2 3 6 3 3 7 6 11 0 SECTION C C SCALE 1 24 3 000 PSI CONCRETE FOOTING 3 6 X 3 6 X 12 WITH 5 5 X 3 BOTTOM EACH WAY 3 CLEAR FROM BOTTOM 0 4 6 PAD THICKNESS 9 5 8 REBAR 1 0 FOOTING BOTTOM 8 5 8 REBAR 0 3 4 1 1 1 9 2 6 3 2 3 3 3 6 12 0 15 6 SECT...

Page 3: ...ctions 0 0 1 9 3 6 12 0 13 9 15 6 1 9 3 6 7 6 9 3 11 0 3000328 A SCALE 1 100 SIZE DWG NO A REV SHEET 3 OF 12 A 12 0 A A 3 CLEAR FROM BOTTOM SECTION A A SCALE 1 36 3 000 PSI CONCRETE FOOTING 3 6 X 3 6 X 12 WITH 5 5 X 3 BOTTOM EACH WAY 3 000 PSI CONCRETE PAD 4 6 7 6 12 0 ...

Page 4: ... with 8 1 2 x 5 5 bolts 16 lock washers and 8 nuts each Fully tighten after all purlins are in place Tighten all upright and truss bolts Lift trusses into place and fasten to uprights with 4 x 1 5 carriage bolts 4 lock washers and 4 nuts at each upright Leave finger tight Place the first section of type S decks and fasten with 4 self drilling screws to the truss Place the next section of type S de...

Page 5: ...present Place a side panel in the lower position and attach with 4 3 8 x 5 5 carriage bolts 4 3 8 carriage bolt washers 4 3 8 washers and 4 Penta nuts Tighten all 6 bolts Place and attach the remaining side panels Place and attach the rear panels with the same method as the side panels 1 3 2 BIKE DEPOT Installation Instructions Panels Front Panel Mounting Location For shelters with front panels in...

Page 6: ...t each hinge Tighten the Penta nuts Then tighten hinge Penta nuts Attach both upper door stops with 2 3 8 x 3 carriage bolts 2 3 8 carriage bolt washers 2 3 8 washers and 2 Penta nuts at each stop Attach 4 hinges with 4 3 8 x 5 carriage bolts 4 3 8 carriage bolt washers 4 3 8 washers and 4 Penta nuts at each hinge If the uprights are not perfectly vertical a washer may be placed between the hinge ...

Page 7: ...tach the door lock bar to the right door with 8 x 3 carriage bolts 4 front door stops 4 spacers 8 washers 4 tube clamps and 8 nylock nuts Once bolts are tightened the lock bar should rotate freely Attach the latch assembly and cover with 6 3 8 x 1 security bolts and 6 3 8 washers The latch assembly can be laterally positioned so the lock bar strike enters and exits the latch smoothly Fill the 8 3 ...

Reviews: