Playcore DERO BIKE DEPOT Manual Download Page 5

www.dero.com     |     1-888-337-6729

© 2018 Dero

Place a side panel in the upper position and 
attach with (2) 3/8” x 5.5” carriage bolts, (2) 3/8” 
carriage bolt washers, (2) 3/8” washers, and (2) 
Penta nuts.  Leave finger tight.

Place and attach the upper front panel in the correct 
position depending on whether front doors or panels 
are present.

Place a side panel in the lower position and 
attach with (4) 3/8” x 5.5” carriage bolts, (4) 3/8” 
carriage bolt washers, (4) 3/8” washers, and (4) 
Penta nuts.  Tighten all (6) bolts.

Place and attach the remaining side panels.

Place and attach the rear panels with the same 
method as the side panels.

1

3

2

BIKE DEPOT

Installation Instructions - Panels

Front Panel Mounting Location

For shelters with 
front panels in 
place of doors

For shelters 
with doors

For shelters with 
front panels in 
place of doors

For shelters 
with doors

Summary of Contents for DERO BIKE DEPOT

Page 1: ...Parts List 5 4 2 1 3 A B C D UPRIGHT BACK WELDMENT TRUSS WELDMENT UPRIGHT FRONT WELDMENT PURLIN WELDMENT TYPE S DECK 2 5 X 5625 1 2 3 4 5 12 1 4 SELF DRILL SCREWS 4 1 2 BOLTS 4 1 2 BOLTS 4 1 2 DIA SIMPSON STRONG BOLT 2 ANCHORS 3 5 MIN EMBEDMENT A B C D ...

Page 2: ...nry Bits 3 8 1 2 BIKE DEPOT Installation Instructions Main Structure C C D D 0 4 6 PAD THICKNESS 1 0 FOOTING BOTTOM 8 5 8 REBAR 9 5 8 REBAR 0 3 4 1 1 1 9 2 6 3 2 3 6 3 3 7 6 11 0 SECTION C C SCALE 1 24 3 000 PSI CONCRETE FOOTING 3 6 X 3 6 X 12 WITH 5 5 X 3 BOTTOM EACH WAY 3 CLEAR FROM BOTTOM 0 4 6 PAD THICKNESS 9 5 8 REBAR 1 0 FOOTING BOTTOM 8 5 8 REBAR 0 3 4 1 1 1 9 2 6 3 2 3 3 3 6 12 0 15 6 SECT...

Page 3: ...ctions 0 0 1 9 3 6 12 0 13 9 15 6 1 9 3 6 7 6 9 3 11 0 3000328 A SCALE 1 100 SIZE DWG NO A REV SHEET 3 OF 12 A 12 0 A A 3 CLEAR FROM BOTTOM SECTION A A SCALE 1 36 3 000 PSI CONCRETE FOOTING 3 6 X 3 6 X 12 WITH 5 5 X 3 BOTTOM EACH WAY 3 000 PSI CONCRETE PAD 4 6 7 6 12 0 ...

Page 4: ... with 8 1 2 x 5 5 bolts 16 lock washers and 8 nuts each Fully tighten after all purlins are in place Tighten all upright and truss bolts Lift trusses into place and fasten to uprights with 4 x 1 5 carriage bolts 4 lock washers and 4 nuts at each upright Leave finger tight Place the first section of type S decks and fasten with 4 self drilling screws to the truss Place the next section of type S de...

Page 5: ...present Place a side panel in the lower position and attach with 4 3 8 x 5 5 carriage bolts 4 3 8 carriage bolt washers 4 3 8 washers and 4 Penta nuts Tighten all 6 bolts Place and attach the remaining side panels Place and attach the rear panels with the same method as the side panels 1 3 2 BIKE DEPOT Installation Instructions Panels Front Panel Mounting Location For shelters with front panels in...

Page 6: ...t each hinge Tighten the Penta nuts Then tighten hinge Penta nuts Attach both upper door stops with 2 3 8 x 3 carriage bolts 2 3 8 carriage bolt washers 2 3 8 washers and 2 Penta nuts at each stop Attach 4 hinges with 4 3 8 x 5 carriage bolts 4 3 8 carriage bolt washers 4 3 8 washers and 4 Penta nuts at each hinge If the uprights are not perfectly vertical a washer may be placed between the hinge ...

Page 7: ...tach the door lock bar to the right door with 8 x 3 carriage bolts 4 front door stops 4 spacers 8 washers 4 tube clamps and 8 nylock nuts Once bolts are tightened the lock bar should rotate freely Attach the latch assembly and cover with 6 3 8 x 1 security bolts and 6 3 8 washers The latch assembly can be laterally positioned so the lock bar strike enters and exits the latch smoothly Fill the 8 3 ...

Reviews: