![Playcore DERO BIKE DEPOT Manual Download Page 2](http://html.mh-extra.com/html/playcore/dero-bike-depot/dero-bike-depot_manual_1566465002.webp)
www.dero.com | 1-888-337-6729
© 2018 Dero
Customer is responsible for preparing the slab with minimum strength of 3,000psi as shown
1
Material Lift or Fork Lift
Wrenches: 9/16”, 3/4”
Socket Wrench with Sockets: 7/16”, 1/2”, 9/16”, 3/4”
Drive Socket 5/16”
Tall Ladder
TOOLS NEEDED
Tape Measure
Level
Hammer Drill
Large Hammer
Chalk Line
Masonry Bits: 3/8”, 1/2”
BIKE DEPOT
Installation Instructions - Main Structure
C
C
D
D
0
4-6" PAD THICKNESS
1'0" FOOTING BOTTOM
8" 5/8" REBAR
9" 5/8" REBAR
0
3
4
1'1"
1'9"
2'6"
3'2"
3'6" 3'3"
7'6"
11'0"
SECTION C-C
SCALE 1 : 24
3,000 PSI CONCRETE
FOOTING:
3'6" X 3'6" X 12" WITH 5-#5 X 3'
BOTTOM EACH WAY
(3" CLEAR FROM BOTTOM)
0
4-6" PAD THICKNESS
9" 5/8" REBAR
1'0" FOOTING BOTTOM
8" 5/8" REBAR
0
3
4
1'1"
1'9"
2'6"
3'2"
3'3"
3'6"
12'0"
15'6"
SECTION D-D
SCALE 1 : 36
DETAIL E
SCALE 1 : 6
HOLES FOR .50" X 5.50"
SIMPSON STRONG BOLT 2
(3.5" MIN. EMBEDMENT)
DRILL HOLES AT INSTALLATION