Playcore DERO BIKE DEPOT Manual Download Page 2

www.dero.com     |     1-888-337-6729

© 2018 Dero

Customer is responsible for preparing the slab with minimum strength of 3,000psi as shown

1

Material Lift or Fork Lift
Wrenches: 9/16”, 3/4”
Socket Wrench with Sockets: 7/16”, 1/2”, 9/16”, 3/4”
Drive Socket 5/16”
Tall Ladder

TOOLS NEEDED

Tape Measure
Level
Hammer Drill
Large Hammer
Chalk Line
Masonry Bits: 3/8”, 1/2”

BIKE DEPOT

Installation Instructions - Main Structure

C

C

D

D

 0 

 4-6" PAD THICKNESS 

 1'0" FOOTING BOTTOM 

 8"   5/8"   REBAR 

 9"  5/8"   REBAR 

 0 

 3 

 4 

 1'1" 

 1'9" 

 2'6" 

 3'2" 

 3'6"   3'3" 

 7'6" 

 11'0" 

SECTION C-C

SCALE 1 : 24

3,000 PSI CONCRETE

FOOTING:

3'6" X 3'6" X 12" WITH 5-#5 X 3'

BOTTOM EACH WAY

(3" CLEAR FROM BOTTOM)

 0 

 4-6" PAD THICKNESS 

 9"  5/8"   REBAR 

 1'0" FOOTING BOTTOM 

 8"  5/8"   REBAR 

 0 

 3 

 4 

 1'1" 

 1'9" 

 2'6" 

 3'2" 

 3'3" 

 3'6" 

 12'0" 

 15'6" 

SECTION D-D

SCALE 1 : 36

DETAIL E

SCALE 1 : 6

HOLES FOR .50" X 5.50"

SIMPSON STRONG BOLT 2

(3.5" MIN. EMBEDMENT)

DRILL HOLES AT INSTALLATION

Summary of Contents for DERO BIKE DEPOT

Page 1: ...Parts List 5 4 2 1 3 A B C D UPRIGHT BACK WELDMENT TRUSS WELDMENT UPRIGHT FRONT WELDMENT PURLIN WELDMENT TYPE S DECK 2 5 X 5625 1 2 3 4 5 12 1 4 SELF DRILL SCREWS 4 1 2 BOLTS 4 1 2 BOLTS 4 1 2 DIA SIMPSON STRONG BOLT 2 ANCHORS 3 5 MIN EMBEDMENT A B C D ...

Page 2: ...nry Bits 3 8 1 2 BIKE DEPOT Installation Instructions Main Structure C C D D 0 4 6 PAD THICKNESS 1 0 FOOTING BOTTOM 8 5 8 REBAR 9 5 8 REBAR 0 3 4 1 1 1 9 2 6 3 2 3 6 3 3 7 6 11 0 SECTION C C SCALE 1 24 3 000 PSI CONCRETE FOOTING 3 6 X 3 6 X 12 WITH 5 5 X 3 BOTTOM EACH WAY 3 CLEAR FROM BOTTOM 0 4 6 PAD THICKNESS 9 5 8 REBAR 1 0 FOOTING BOTTOM 8 5 8 REBAR 0 3 4 1 1 1 9 2 6 3 2 3 3 3 6 12 0 15 6 SECT...

Page 3: ...ctions 0 0 1 9 3 6 12 0 13 9 15 6 1 9 3 6 7 6 9 3 11 0 3000328 A SCALE 1 100 SIZE DWG NO A REV SHEET 3 OF 12 A 12 0 A A 3 CLEAR FROM BOTTOM SECTION A A SCALE 1 36 3 000 PSI CONCRETE FOOTING 3 6 X 3 6 X 12 WITH 5 5 X 3 BOTTOM EACH WAY 3 000 PSI CONCRETE PAD 4 6 7 6 12 0 ...

Page 4: ... with 8 1 2 x 5 5 bolts 16 lock washers and 8 nuts each Fully tighten after all purlins are in place Tighten all upright and truss bolts Lift trusses into place and fasten to uprights with 4 x 1 5 carriage bolts 4 lock washers and 4 nuts at each upright Leave finger tight Place the first section of type S decks and fasten with 4 self drilling screws to the truss Place the next section of type S de...

Page 5: ...present Place a side panel in the lower position and attach with 4 3 8 x 5 5 carriage bolts 4 3 8 carriage bolt washers 4 3 8 washers and 4 Penta nuts Tighten all 6 bolts Place and attach the remaining side panels Place and attach the rear panels with the same method as the side panels 1 3 2 BIKE DEPOT Installation Instructions Panels Front Panel Mounting Location For shelters with front panels in...

Page 6: ...t each hinge Tighten the Penta nuts Then tighten hinge Penta nuts Attach both upper door stops with 2 3 8 x 3 carriage bolts 2 3 8 carriage bolt washers 2 3 8 washers and 2 Penta nuts at each stop Attach 4 hinges with 4 3 8 x 5 carriage bolts 4 3 8 carriage bolt washers 4 3 8 washers and 4 Penta nuts at each hinge If the uprights are not perfectly vertical a washer may be placed between the hinge ...

Page 7: ...tach the door lock bar to the right door with 8 x 3 carriage bolts 4 front door stops 4 spacers 8 washers 4 tube clamps and 8 nylock nuts Once bolts are tightened the lock bar should rotate freely Attach the latch assembly and cover with 6 3 8 x 1 security bolts and 6 3 8 washers The latch assembly can be laterally positioned so the lock bar strike enters and exits the latch smoothly Fill the 8 3 ...

Reviews: