Play Mor Watch Tower Assembly Instructions Manual Download Page 17

     S

COOP

 W

AVE

 S

LIDE

 I

NSTALLATION

 

A. 

Center the Scoop Wave Slide in a standard opening. 

Make sure the upright mounting face of the slide is 
pushed against the Tower. Insert 1 — 4¼” lag bolt 
from the Scoop Wave Slide Hardware Pack 

(packaged 

separately) 

into each of the two holes in the upright 

mounting face. This should securely anchor the slide 
against the Tower.  

A

CCESSORY

 I

NSTRUCTIONS

 

     W

AVE

 S

LIDE

 I

NSTALLATION

 

Center the Wave Slide in a standard opening. From outside the Tower make sure that 

the slide is not incorrectly angled to the right or left. Fasten the slide to the deck us-
ing 4 — Slide Screws. Insert the longer screws through the deck and into the floor 
frame 2x4 without washers. Place washers on the shorter screws and insert them 
through the pre-
drilled holes of the 
slide into the deck. 
Do not over 
tighten these 
screws. They can 
easily strip out 
and not hold. No 
fastening is re-
quired at the bot-
tom of the slide.  

B.

 Use the remaining screws and washers from 

the Scoop Wave Slide Hardware Pack to  
fasten the slide to the deck as pictured at 
left. Do not over tighten these screws. They 
can easily strip out and not hold. No fasten-
ing is required at the bottom of the slide.  

Summary of Contents for Watch Tower

Page 1: ...Watch Tower Assembly Instructions...

Page 2: ...edge Hammer Tape Measure Cordless or Electric Drill 5 32 3 16 Drill Bit Phillips Driver Bit Square Driver Bit provided in the Hardware Pack 7 16 1 2 and 9 16 Sockets powered by either a Ratchet or an...

Page 3: ...children using the set See Step 10 for more details 3 If you need an extra standard size opening on your play set replace Rail 2 at one side of the Tower with a Rail 3 4 If you will be installing a Ca...

Page 4: ...orner The side of the Posts with the screw heads showing should face in with the side of the Posts that resembles a sandwich placed against the long sides of the Sandbox illustrated below B Fasten eac...

Page 5: ...A Place the Floor on top of the Posts The Posts should slip up inside the outer 2x4 s of the Floor B Fasten each Post to the Floor with 4 2 screws per Post HARDWARE THIS PAGE 16 2 SCREWS LONG SIDE SHO...

Page 6: ...ong Corner Braces Use two 2 of the extra long Corner Braces on the side of the Tower from which the Attachment Beam will extend This is normally on the long side of the tower See photos below and in S...

Page 7: ...nt Beam Block in the Attachment Beam Hardware Box Position the block on Rail 2 as pictured below with the 4x4 end up The bottom edge of this 4x4 illustrated at right should be aligned with the bottom...

Page 8: ...rews around each countersunk hole RAIL 2 HARDWARE THIS PAGE 10 2 SCREWS STEP 8 Place the remaining Rail 2 on the other side of the Floor NOTE This rail can be re placed with a Rail 3 See Helpful Tips...

Page 9: ...stalls at each end of this Tower There are a number of dif ferent installment options from which to choose Follow the lettered steps on the next page in order to complete Step 10 NOTE If you will be i...

Page 10: ...ten it using 2 2 screws at each end Your Climb Opening is now prepared B Install Rail 1 in the place s you have chosen using 6 2 screws per rail Insert 3 screws through the corner upright into Rail 2...

Page 11: ...illed holes at each end of the Tower as pic tured Use 6 2 screws to fasten each one STEP 12 Pre drill the remaining four 4 countersunk lag bolt holes at the bottom of the rails with a 3 16 drill bit I...

Page 12: ...will need 16 2 screws and 8 4 screws to com plete this step HARDWARE THIS PAGE 16 2 SCREWS 8 4 SCREWS STEP 14 This step prepares for the installation of the Canopy Attachment A Locate the three 3 loo...

Page 13: ...f the rail as pictured at right Using the pre drilled holes in the fastening gusset fasten each Canopy Attachment upright to the rail with 3 2 screws B Rest the horizontal 2x6 of the Canopy Attachment...

Page 14: ...osite end of the Tower pull the Canopy somewhat taut while making sure that it is laying nicely all along the peak of the Canopy Attachment Fasten the Canopy with 7 1 Canopy Screws HARDWARE THIS PAGE...

Page 15: ...Stakes Both Stakes should be on the inside of the Sandbox Allow at least an inch of Stake above ground and fasten each one to the Sandbox with 2 2 screws Always place the Stakes on the sides of the To...

Page 16: ...s with a 3 16 drill bit ACCESSORY INSTRUCTIONS CLIMB INSTALLATION Position your Rock Climb Pipe Climb or Cargo Net in its prepared opening The hori zontal 2x4 at the top of the climb should rest secur...

Page 17: ...slide is not incorrectly angled to the right or left Fasten the slide to the deck us ing 4 Slide Screws Insert the longer screws through the deck and into the floor frame 2x4 without washers Place wa...

Page 18: ...tower interferes with the installation illustrated below ACCESSORY INSTRUCTIONS B Fasten four 4 eye screws to the uprights beside the standard opening The eye screws can be found clipped in the snaps...

Page 19: ...mily and anybody looking for a quality swing set Thanks Chona Martin Clayton NC We haven t even had our play set a week and we are in love with it Thank you for everything Lisa Likowski Wooster OH I m...

Page 20: ......

Reviews: