
S
TEP
#10 -
CONT
.
A.
Choose one of the following numbered installation patterns:
2. Alternate Installation.
Rail #1’s can be in-
stalled against the right or left side of the Tower
on both ends.
(pictured with both rails to the
left)
3. Climb Installation.
Rail #1 will be installed at
only one end of the floor if you will be install-
ing a Rock Climb, Pipe Climb, or Cargo Net.
Find the Climb Opening 2x4 in your kit. It is a
loose 2x4 measuring 46½” in length. Install it at
22-30”above the Floor based on the size of the
children that will be using the play set. (26” is a
good average height.) Fasten it using 2 — 2¼”
screws at each end. Your Climb Opening is now
prepared.
B.
Install Rail #1 in the place(s) you have chosen using 6 —
2¼” screws per rail. Insert 3 screws through the corner
upright into Rail #2. Drive 2 screws through the 49”
horizontal 2x6 into the center upright 2x4 of Rail #1.
Place the last screw from under the Floor. It should be
driven into the center upright of Rail #1 through a deck
board.
(See arrows
at right.)
1. Preferred Installation.
Rail #1’s can be in-
stalled cat-a-corner from each other as pictured.
Notice that the opening for your slide or ladder
is on the left. This is the preferred installation
pattern. It is especially preferred if this play set
will include a Watch Tower Cabin Kit since the
Cabin Kit door is on the right.
HARDWARE
(
THIS
PAGE
)
12 — 2¼”
SCREWS
Summary of Contents for Watch Tower
Page 1: ...Watch Tower Assembly Instructions...
Page 20: ......