
A
CCESSORY
I
NSTRUCTIONS
G
ANG
P
LANK
I
NSTALLTION
Place the gang plank mounting face against the tower directly below a
standard opening. The
floor of the gang plank
should be aligned with the
floor of the tower. From
underneath the tower, in-
sert 2
-
3” screws through
the floor frame and into
the mounting face of the
gang plank.
Next install 2
-
3” lag
bolts through the floor
frame and into the mount-
ing face of the gang
plank. Predrill for each
lag bolt with a 9/32” drill
bit before installing the
lag bolts.
Drill 4
-
3/4” holes in the rail slats at the top of the gang
plank. The first set at 16” from the bottom of the slats
and the second set at 27½”.
After the holes are drilled push the rope through the
holes, pull tight, and make a knot to secure the rope.
Summary of Contents for Poly Watch Tower
Page 1: ...Assembly Instructions Poly Watch Tower...
Page 28: ......