N i p p l e D r i n k e r S y s t e m I n s t a l l a t i o n M a n u a l
N i p p l e D r i n k e r S y s t e m I n s t a l l a t i o n M a n u a l
When assembling the
line, make sure to
position each segment
of the line, with the leg
side of the tray facing
into the flow direction.
17
17.1
18
19
20
35.5mm (1.4")
ø8mm (0.3")
10.1mm (0.4")
21
21.1
21.2
21.3
22.1
22.2
22.3
22.4
22.5
Do not
tighten the
screws at
this stage.
22
Air flo
w dir
ection