Fill the floor opening with fire stop sealing compound (e.g. FIREPRO M799
GPG Fire Stop sealing compound).
Add waterproof material (e.g. Loctite 5366) above the compound and into
the cable pipe.
The figure below is an example (installation to a ready-made concrete floor).
2 Pre-installation requirements
12 Planmeca Compact i3
Installation manual
Summary of Contents for Compact i3
Page 1: ...PlanmecaCompact i3 installation manual EN 30020733 30020733...
Page 68: ...12 Installing suction element 64 Planmeca Compact i3 Installation manual...
Page 104: ......
Page 105: ......