![Planet IGS-5225 Series User Manual Download Page 58](http://html1.mh-extra.com/html/planet/igs-5225-series/igs-5225-series_user-manual_1563274058.webp)
User’s Manual of IGS-5225 series
58
2.2 Installing the Industrial Managed Switch
This section describes how to install your
Industrial Managed Switch
and make connections to the
Industrial Managed
Switch
. Please read the following topics and perform the procedures in the order being presented. To install your
Industrial
Managed Switch
on a desktop or shelf, simply complete the following steps.
In this paragraph, we will describe how to install the
Industrial Managed Switch
and the installation points attended to it.
2.2.1 Installation Steps
1.
Unpack the Industrial Managed Switch
2.
Check if the DIN-Rail is screwed on the Industrial Managed Switch or not
. If the DIN-Rail is not screwed on the
Industrial Managed Switch
, please refer to
DIN-rail Mounting
section for DIN-rail installation. If users want to
wall-mount the
Industrial Managed Switch
, please refer to the
Wall Mount Plate Mounting
section for wall-mount plate
installation
.
3.
To hang the Industrial Managed Switch on the DIN-rail track or wall.
4.
Power on the Industrial Managed Switch
. Please refer to the
Wiring the Power Inputs
section for knowing the
information about how to wire the power. The power LED on the
Industrial Managed Switch
will light up. Please refer to
the
LED Indicators
section for indication of LED lights
.
5.
Prepare the twisted-pair, straight-through Category 5 cable for Ethernet connection
.
6.
Insert one side of RJ45 cable (category 5) into the Industrial Managed Switch Ethernet port
(RJ45 port) while the
other side to the network device’s Ethernet port (RJ45 port), e.g., Switch PC or Server. The UTP port (RJ45) LED on the
Industrial Managed Switch
will light up when the cable is connected with the network device. Please refer to the
LED
Indicators
section for LED light indication
.
Make sure that the connected network devices support MDI/MDI-X. If it does not support,
use the crossover Category 5 cable.
7.
When all connections are set and all LED lights show normal, the installation is completed.