![Planet IGS-5225 Series User Manual Download Page 396](http://html1.mh-extra.com/html/planet/igs-5225-series/igs-5225-series_user-manual_1563274396.webp)
User’s Manual of IGS-5225 series
396
4.6.6 Port Sequential
This page allows the user to configure the PoE Ports started up interval time. The PoE Port will start up one by one as
Figure
4-6-1-5
shows.
Figure 4-6-1-5:
PoE Port Sequential Power Up Interval Configuration Screenshot
The PoE port will start up after the whole system program has finished running.
The page includes the following fields:
Object
Description
•
Sequential Power up
Option
Allows user to enable or disable Sequential Power up function.
•
Sequential Power up
Interval
Allows user to configure the PoE Port Start Up interval time.
•
Sequential Power up
Port Option
There are two modes for Starting Up the PoE Port
By Port:
The PoE Port will start up by following Port number.
By Priority:
The PoE Port will start up by following the PoE Priority.
Buttons
: Click to apply changes
: Click to undo any changes made locally and revert to previously saved values.