![background image](http://html.mh-extra.com/html/planet-networking-and-communication/bsp-360/bsp-360_quick-installation-manual_1563952012.webp)
11
Step 2.
Install battery
Battery
DC
DC
Bat.
PV
Alarm
+
+
1 2 3 4 5 6
Bat.In/Out
1. Connect the negative electrode of the battery to the terminal for the negative
electrode of the battery on the BSP-360.
2. Connect the positive electrode of the battery to the terminal for the positive
electrode of the battery on the BSP-360.
3. After the battery is well connected to the BSP-360, the
PWR LED will be ON
and System LED will slowly blink
, and
Fault LED will slowly blink
for PV
not connected.
The BSP-360 accepts the
24V DC
battery system. Please pay
attention to the battery characteristics and also refer to the section
--
Recommended Settings for Different Batteries
in the Quick
Installation Guide.
Note
Be noted for the thickness of electric wire and please refer to the
section --
Recommended Use of the Connected Wires
in the
Quick Installation Guide.
The default
LVD (Low Voltage Disconnection)
is set at
22.2V
DC
; we suggest charge the voltage of battery to
23.5V DC or
above
for the BSP-360.
Check the total power consumption of your connected network
device before installation. Improper battery capacity could shorten
the battery life or make your network device lack of power supply.
Note
Please link PLANET download center and download
BSP-
360-PV&BAT_calculation
. The calculation list can help you to
select solar panel and battery.