background image

Summary of Contents for BSP-360

Page 1: ......

Page 2: ...Industrial Renewable Energy 4 Port 10 100 1000T 802 3at PoE Managed Ethernet Switch BSP 360 Quick Installation Guide ...

Page 3: ...c array and any other device used 3 To reduce the risk of short circuits use insulated tools when installing or working with the inverter the controller the batteries or any DC source e g PV 4 Remove all jewelry This will greatly reduce the chance of accidental exposure to live circuits 5 The controller contains more than one live circuit batteries and PV array Power may be present at more than on...

Page 4: ...ardware Introduction 6 3 1 Front Panel 6 3 2 LED Indicators 7 3 3 Upper Panel 8 4 Hardware Installation 10 5 Web Management 16 6 Customer Support 18 Appendix A Recommended Use of the Connected Wires 19 Appendix B Recommended Settings for Different Batteries 20 ...

Page 5: ...hould contain the following items 1 x BSP 360 1 x Quick Installation Guide 1 x Wall Mounting Kit 1 x DIN Rail Kit 5 x RJ45 Dust Cap If any of these are missing or damaged please contact your dealer immediately If possible retain the carton including the original packing materials to enable you to repack the product in case there is a need to return it to us for repair ...

Page 6: ...03 Vista Windows 7 Windows 8 Windows 10 MAC OS X Linux Fedora Ubuntu or other platforms compatible with TCP IP protocols The above workstation is installed with Web browser and JAVA runtime envi ronment plug in Ethernet Port connection Use standard network UTP cables with RJ45 connectors PV and battery Two 12V batteries connected in series The maximum operating voltage of PV is 45V Note It is reco...

Page 7: ...3 1 shows the front panel of BSP 360 Item Interface Description 1 Port 1 Port 4 4 10 100 1000BASE T RJ45 auto MDI MDI X ports with 802 af at PoE injector function 2 Port 5 One 10 100 1000BASE T RJ45 auto MDI MDI X port Port 5 functions as WAN port when the operation mode of BSP 360 is configured to Gateway mode 3 USB Connect the USB storage to USB port and back up the configuration file 4 Reset Bu...

Page 8: ...ystem consumes over 50 watt PoE power budget 100W Green On To indicate the system consumes over 100 watt PoE power budget 120W Green On To indicate the system consumes the total 120 watt PoE power budget PoE 10 100 1000BASE T Interfaces Port 1 to Port 4 LED Color Function LNK ACT Green Blinks To indicate the link through that port is successfully established PoE Orange Lights To indicate the port ...

Page 9: ...ith PV and battery power inputs PV DC 24 45V Bat DC 24V Bat PV Alarm 1 2 3 4 5 6 Figure 3 2 Upper Panel The input voltage range of each interface is shown as follows PV In Connector 24 45V DC Solar PV 24 45V DC PV DC 24 45V Bat DC 24V Bat PV Alarm 1 2 3 4 5 6 DC DC Figure 3 3 PV In Connector ...

Page 10: ...at DC 24V Bat PV Alarm 1 2 3 4 5 6 24V DC DC DC Figure 3 4 Battery In Out Note The wire gauge for the terminal block should be in the range from 14 to 24 AWG DO Connectors Level 0 24V 2 1V 0 1V Level 1 2 1V 24V 0 1V 1 2 3 4 5 6 DO Load 5 24VDC GND ...

Page 11: ...AP PoE PoE PoE PoE Ethernet Switch Media Converter DC Powered Device Monitoring Center Solar PV Turbine DC DC Power Line DC 1000BASE T UTP PoE 1000BASE T UTP with PoE 2 4GHz 802 11n N N Please follow the following steps to install the system Step 1 Install BSP 360 Place the BSP 360 in a desired location using the wall mount fixtures Note a Please install the BSP 360 in a proper enclosure or shelte...

Page 12: ...tery characteristics and also refer to the section Recommended Settings for Different Batteries in the Quick Installation Guide Note Be noted for the thickness of electric wire and please refer to the section Recommended Use of the Connected Wires in the Quick Installation Guide The default LVD Low Voltage Disconnection is set at 22 2V DC we suggest charge the voltage of battery to 23 5V DC or abo...

Page 13: ...or battery charge if the battery is not full And Fault LED will turn off Note Be noted for the thickness of electric wire and please refer to the section Recommended Use of the Connected Wires in the Quick Installation Guide Check the total power consumption of your device and the sunshine duration of your area from the weather bureau for a proper PV Improper PV could shorten the battery life or p...

Page 14: ... such as PoE camera and PoE wireless AP are powered the PoE in use LED will turn ON and Link Act LED will blink for a successful connection or data receiving Note Please use Cat5 5e or above cable and the maximum distance should within 100 meters If the Network devices are installed outdoors please consider to install a lightening arrestor to protect the network device and the BSP 360 ...

Page 15: ...ve and Negative DC wires into the V and V terminals respec tively Terminals 1 and 3 for Power 1 and Terminals 2 and 4 for Power 2 3 Connect the other points of DC power wires to the power devices Tighten the wire clamp screws for preventing the wires from loosening Maximum Output 24 Watts Powered Device 1 V1 V2 V1 V2 One Powered Device Total Maximum Output 24 Watts Powered Device Powered Device 1 ...

Page 16: ...for the terminal block should be in the range from 14 to 24 AWG The external device should also be grounded properly Please ensure the output voltage is correct for remote device Otherwise it will damage your remote device Step 6 Connect to PC RJ45 UTP Cable IP Address 192 168 0 100 IP Address 192 168 0 x After completing the above 6 steps the BSP 360 is ready for service ...

Page 17: ...where x is a number between 1 and 254 except 100 and the default subnet mask is 255 255 255 0 BSP 360 Ethernet Switch Monitoring Center Logging in to the BSP 360 Step 1 Use Internet Explorer 8 0 or above for Web browser and enter IP address http 192 168 0 100 the factory default IP address to access the Web interface Step 2 When the following dialog box appears please enter the default user name a...

Page 18: ...tep 4 The Switch Menu on the left of the Web page lets you access all the functions and status the BSP 360 provides Now you can use the Web management interface to continue the Switch management Please refer to the user manual for more understanding Note For security reason please change and memorize the new pass word after this first setup ...

Page 19: ...eam mail address support_switch planet com tw BSP 360 User s Manual http www planet com tw en support download php type1 22153 model 48944 type 3 BSP 360 PV BAT Calculation http www planet com tw en support faq php key 5BBSP 360 5D 20 PV 26BAT Calculation Copyright PLANET Technology Corp 2016 Contents are subject to revision without prior notice PLANET is a registered trademark of PLANET Technolog...

Page 20: ... ft 4 30m 22 50 ft 6 86 m 36 0 ft 11 0m 56 4 ft 17 22m 5 0 2 80 ft 0 86m 4 4 ft 1 36m 7 06 ft 2 16m 11 26 ft 3 42m 18 0 ft 5 48m 28 2 ft 8 6m 7 5 1 86 ft 0 56m 2 96 ft 0 90m 4 70 ft 1 44m 7 50 ft 2 28m 12 0 ft 3 66m 18 82 ft 5 74m 10 1 40 ft 0 42m 2 22ft 0 68m 3 52 ft 1 08m 5 62 ft 1 72m 9 0 ft 2 74m 14 12 ft 4 30m 12 5 1 12 ft 0 34m 1 78ft 0 54m 2 82 ft 0 86m 4 50 ft 1 38m 7 20 ft 2 20m 11 30 ft ...

Page 21: ... 28 0 32 0V LVD Low Voltage Disconnection 22 2V DC 21 0 25 0V LVR Low Voltage Reconnection 24 8V DC 23 0 27 0V Temperature compensation Baseline 25 C 40 mV C for NiCad type batteries Charge cut off 55 C Battery type Lead acid Battery Default Setting System voltage 24V Maximum input voltage 45V DC Output voltage for load Equal to battery s voltage Float charge voltage 27 2V DC 26 0 30 0V Absorption...

Page 22: ......

Reviews: