Fluid Power Car User Guide 60070 V0113
5
11. Take Part 1 and insert the front axle bearing assembly into the large
hole toward the nose of the car. Be sure the bearings are positioned so
that they spin forward.
12. Place Part 2 on the other side of the axle as shown.
13. Holding the parts together, insert a 5/8" nylon spacer between the
holes under and above the front axle. Tighten these with a 1" screw,
making sure to put them in from the Part 1 with the circles. Tip: This
may be easier to do if you hold the spacer with a small pair of pliers.
14. Take the gear train assembly and place it into the car body so the top
gear rack is over one gear (Part 6) and the bottom gear rack is under
the other gear. Make sure the syringe lips are inserted into the slots on
the Parts 1 and 2.
15. Insert the remaining two 5/8" nylon spacers into the remaining circled
holes of the Part 1. Secure them with the 1" screws.
Steps 11-15
1
2
1" screws
3/8" x 5/8"
nylon spacers
3/8" x 5/8"
nylon spacers
1" screws