background image

 

 

 

 

Operating 

Instructions  for 

Electrical Heater Units 

 

 

PITSAN 

 

Page 12 / 16 

 

 

PİTSAN MAK. SAN. VE TİC. LTD ŞTİ, 

Esenyurt Yolu Üzeri No: 66 - 68 Bağlar Mevkii,  TR – 34850 Avcılar - İSTANBUL

 

Tel.: 0212/4281885, Fax: 0212/4281661, Email:

[email protected]

http: //www.pitsan.com

 

7.3.  First Start up and controls 

 
1- Place the fan switch to ON position 
2- Set the temperature control thermostat to a setting below the temperature 
3- Energize the heater electrical supply circuit 
4- The heater fan should come on but the heater should remain off 
5- Place the fan switch to OFF position 
6- The fan should go off 
7- Set the temperature control thermostat to a setting above the current room temperature 
8- The heater should come on and the fan should energize approx. 1-2 minutes. If the room 
temperature is high or the heater is mounted too close to ceieling or walls the unitmay cycle 
on the thermal high limits of the motor and/or heater 
9- Check out and repost any unusual or questionable operating characteristics, such as noise, 
vibration ..etc 
10- Set the fan switch and temperature control on desired operating positions 
 

7.4.  Operation 

1- Before the unit is energized, the discharge louvers should be be adjusted for desired air 
deflection 
2- Perform the operation steps for the applicable temperature control option 
2- Place all switches in their normal operating position and place the unit heater in service. 
 

8   SPARE PARTS 

 
All replacements must be factory supplied to ensure safe heater operation. PITSAN assumes 
no liability for and provides no warranty against damage arising from the use of non-original 
spare parts and accessories. 

Reference heater model numbers for ordering 
 
SERVICE AND SPARE PART CONTACT: 
 

PİTSAN MAK. SAN. VE TİC. LTD ŞTİ, 

Esenyurt Yolu Üzeri No: 66 - 68 Bağlar Mevkii,  TR – 

34850 Avcılar - İSTANBUL    Tel.: 0212/4281885, Fax: 0212/4281661,  
Email:

[email protected]

http: //www.pitsan.com

 

 
 
Spare parts provided: 
 
- Fan 
- Motor 
- Resistance 
- On/Off Switch 
- Thermostat 
- Louvers 
 

Summary of Contents for EKI 400x200-10.5-3/3x3.5 kw

Page 1: ...senyurt Yolu zeri No 66 68 Ba lar Mevkii TR 34850 Avc lar STANBUL Tel 0212 4281885 Fax 0212 4281661 Email pitsan pitsan com http www pitsan com INSTALLATION OPERATION MAINTENANCE INSTRUCTIONS ELECTRIC...

Page 2: ...n com CONTENTS 1 GENERAL 3 2 SAFETY 3 2 1 Safety instructions 3 2 2 Correct use 3 3 DESCRIPTION OF THE UNIT 5 4 OPERATING PRINCIPLE 7 5 APPLICATION AND INTENDED USE 7 6 PACKAGING HANDLING STORAGE 8 7...

Page 3: ...ccordance with local electrical codes This equipment requires a ground as precaution against electrical shock Basic precautions should always be followed to reduce the risk of fire electric shock and...

Page 4: ...working properly in threephase models Hot Furface The surface temperature of the heater may rise up to temperatures which will cause inquiry Do not touch the surface while the heater is operating In...

Page 5: ...PITSAN Page 5 16 P TSAN MAK SAN VE T C LTD T Esenyurt Yolu zeri No 66 68 Ba lar Mevkii TR 34850 Avc lar STANBUL Tel 0212 4281885 Fax 0212 4281661 Email pitsan pitsan com http www pitsan com 3 DESCRIPT...

Page 6: ...ater Units PITSAN Page 6 16 P TSAN MAK SAN VE T C LTD T Esenyurt Yolu zeri No 66 68 Ba lar Mevkii TR 34850 Avc lar STANBUL Tel 0212 4281885 Fax 0212 4281661 Email pitsan pitsan com http www pitsan com...

Page 7: ...evices that rotate the fan to move the heated air from the heater to the space When the unit heater wattage is over loaded one or more CONTACTORS are employed to switch the electrical current to the e...

Page 8: ...ents on pallets It is essential that great care is exercised when handling the unit When handling the equipment care should be taken with corners and edges and that the weight distribution within the...

Page 9: ...imum recommended mounting height to bottom of heater 4 5meters Minimum clearance from walls and ceiling are Z 250mm VERTICAL DISCHARGE To ensure proper heating of floor surfaces observe the following...

Page 10: ...ctrical Heater Units PITSAN Page 10 16 P TSAN MAK SAN VE T C LTD T Esenyurt Yolu zeri No 66 68 Ba lar Mevkii TR 34850 Avc lar STANBUL Tel 0212 4281885 Fax 0212 4281661 Email pitsan pitsan com http www...

Page 11: ...ctrical Heater Units PITSAN Page 11 16 P TSAN MAK SAN VE T C LTD T Esenyurt Yolu zeri No 66 68 Ba lar Mevkii TR 34850 Avc lar STANBUL Tel 0212 4281885 Fax 0212 4281661 Email pitsan pitsan com http www...

Page 12: ...gh limits of the motor and or heater 9 Check out and repost any unusual or questionable operating characteristics such as noise vibration etc 10 Set the fan switch and temperature control on desired o...

Page 13: ...lectrical cable insulations contactors to avoid any short circuits Be sure that all clearances for air intake are kept as installation 10 POSSIBLE PROBLEM CAUSES AND SOLUTIONS PROBLEM POSSIBLE CAUSE S...

Page 14: ...ate of normal service when installed and operated in accordance with the instructions provided by the Company and subject to the following conditions 1 Since the paint finish may be damaged in use no...

Page 15: ...212 4281885 Fax 0212 4281661 Email pitsan pitsan com http www pitsan com 12 APPENDIX The customers confirm by their signatures that they have received read and understood the operating and maintenance...

Page 16: ...t to internal manufacturing checks with monitoring of the final assesment by PITSAN MACHINE MODEL LIST ETA EKI series electrical heating units APPLICABLE DIRECTIVES 2006 42 EC MACHINERY SAFETY DIRECTI...

Reviews: