Pitco SSHLV (ROV) Gas Fryers
20. Lift up and pull out the tank.
NOTE:
Lifting the tank requires two
(2) technicians.
21. Set tank on floor.
22. Remove the drain line using a pipe wrench.
23. Remove the four (4) screws, which hold the
flue, using a 5/16 inch socket and 3/8 inch
close-ended wrench.
24. Remove the return valve using two
adjustable wrenches.
25. Remove actuator with needle nose pliers.
26. Remove filter piping with 1-1/16 inch
wrench.
27. Follow steps 1 through 26 in reverse to
reinstall a new frypot.
L22-392 Rev 1
67
Summary of Contents for SSHLV Series
Page 13: ...Pitco SSHLV ROV Gas Fryers Figure 2 Auto Filtration Board AFB L22 392 R1 13...
Page 37: ...Pitco SSHLV ROV Gas Fryers L22 392 R1 37...
Page 75: ...Pitco SSHLV ROV Gas Fryers 34Information Charts Tables L22 392 Rev 1 75...
Page 86: ...Pitco SSHLV ROV Gas Fryers 35 8 Wiring Diagram Full Vat with SCB L22 392 Rev 1 86...
Page 87: ...Pitco SSHLV ROV Gas Fryers 35 9 Wiring Diagram Basket Lifts L22 392 Rev 1 87...
Page 88: ...Pitco SSHLV ROV Gas Fryers 35 10 Wiring Diagram Filter Motor 115V 60Hz L22 392 Rev 1 88...
Page 89: ...Pitco SSHLV ROV Gas Fryers 35 11 Wiring Diagrams Filter Motor 208 240V L22 392 Rev 1 89...
Page 90: ...Pitco SSHLV ROV Gas Fryers NOTES L22 392 Rev 1 90...
Page 91: ...Pitco SSHLV ROV Gas Fryers NOTES L22 392 Rev 1 91...