Pitco SSHLV (ROV) Gas Fryers
precautions involved, and have complied with all requirements of applicable national and local
codes.Qualified Service Personnel
Qualified service personnel are those who are familiar with Pitco equipment and who have been
authorized by Pitco Frialator to perform service on the equipment. All authorized service personnel are
required to be equipped with a complete set of service and parts manuals, and to stock a minimum
amount of parts for Pitco equipment. Failure to use qualified service personnel will void the Pitco
warranty on your equipment
2.4 Shipping Damage Claim Procedure
What to do if your equipment arrives damaged:
Please note that this equipment was carefully inspected and packed by skilled personnel before leaving
the factory. The freight company assumes full responsibility for safe delivery upon acceptance of the
equipment.
1.
File Claim for Damages Immediately
- regardless of extent of damage.
2.
Inspect For and Record All Visible Loss or Damage,
and ensure that this information is
noted on the freight bill or express receipt and is signed by the person making the delivery.
3.
Concealed Loss or Damage-
If damage is unnoticed until equipment is unpacked, notify the
freight company or carrier
immediately
upon discovery and file a concealed damage claim.
This must be submitted within 15 days of date of delivery. Be sure to retain container for
inspection.
PITCO DOES NOT ASSUME RESPONSIBILITY FOR DAMAGE OR LOSS INCURRED IN
TRANSIT.
3 Theory of Operation
SSHLV Series gas fryers utilize a welded, stainless steel fryvat that is directly heated with high
efficiency, atmospheric burner tubes. The atmospheric burner tubes eliminate the maintenance heavy
and inefficient (over time due to clogging) blowers used in other fryers. Heat tubes provide as much as
80% more surface area for heat transfer than open vat fryers (tubeless), providing faster recovery
without scorching the oil. Each tube, four total, is fitted with proprietary, incoloy baffles that are heated
by air/gas jet emitted from our patented burners. The baffles transfer heat to the fryvat by means of
infrared radiation and conduction plus convection flow from the air/gas jet. The tubular heat also allows
for a “cold zone” below the tubes where cooking debris will settle at t temperature much lower than the
cooking temperate. The lower temperature prevents the debris from carbonizing and oxidizing the
cooking oil prematurely as typically found in non-tube style fryvats. In full-vat units, gas flow to the
burners is regulated by one electromechanical gas valve. In split-vat units, each burner bank has its
own valve to independently control each vat. All fryers in this series are equipped with 24 V AC gas
valve systems, and all are configured with matchless ignition.
3.1 The Matchless Ignition System
An ignition module, mounted behind the gas valve, is connected to an ignitor/pilot assembly between
the burners. The ignition module performs three important functions: provides an ignition spark,
supplies voltage to the gas valve, and proofs the pilot flame. The module employs a four second time
delay circuit (after flame sense) and a signal that activates the gas valve. Two types are currently used:
A closed-box design is used in most fryers, but in some fryers built for export, the module is packaged
differently. A single “one-spark” module is used on current production full-vat fryers. All dual-vat fryers
use two single “one-spark” modules. The ignitor/pilot assembly consists of an igniter, a pilot tube/hood,
and a flame sensor.
L22-392 R1
11
Summary of Contents for SSHLV Series
Page 13: ...Pitco SSHLV ROV Gas Fryers Figure 2 Auto Filtration Board AFB L22 392 R1 13...
Page 37: ...Pitco SSHLV ROV Gas Fryers L22 392 R1 37...
Page 75: ...Pitco SSHLV ROV Gas Fryers 34Information Charts Tables L22 392 Rev 1 75...
Page 86: ...Pitco SSHLV ROV Gas Fryers 35 8 Wiring Diagram Full Vat with SCB L22 392 Rev 1 86...
Page 87: ...Pitco SSHLV ROV Gas Fryers 35 9 Wiring Diagram Basket Lifts L22 392 Rev 1 87...
Page 88: ...Pitco SSHLV ROV Gas Fryers 35 10 Wiring Diagram Filter Motor 115V 60Hz L22 392 Rev 1 88...
Page 89: ...Pitco SSHLV ROV Gas Fryers 35 11 Wiring Diagrams Filter Motor 208 240V L22 392 Rev 1 89...
Page 90: ...Pitco SSHLV ROV Gas Fryers NOTES L22 392 Rev 1 90...
Page 91: ...Pitco SSHLV ROV Gas Fryers NOTES L22 392 Rev 1 91...