
L80-029 Rev 5 10/07 6
e. Thread the compression nut on the corrugated tubing
end of the SCBS Valve Assembly onto the orifice
assembly that you inserted into the runner tube in
step c and tighten with a 1/2” (13 mm) wrench.
f.
Install the orifice retainer bracket onto the pilot
bracket and SCBS Orifice assembly. This will secure
the orifice assembly into the runner tube.
g. Tighten ALL joints on the SCBS Valve assembly with
a ½” (13 mm) wrench. Reinstall the pilot tubing into
the gas valve.
h. Reconnect the control harness to the main gas valve,
and if you removed a Solid State Control earlier in
this procedure you may re-install it at this time.
Follow this procedure to prepare and install the
SCBS Control Board and Harnesses:
a. Using a phillips head screwdriver, remove the two
screws that secure front panel and rotate the control
assembly down. Disconnect the control harness and
remove the front panel assembly from the appliance.
(This will not be necessary if your model uses a solid-
state control). Store the front panel assembly in a safe
place to avoid damaging the control.
Summary of Contents for L80-029
Page 15: ...13 L80 029 Rev 5 10 07 ...
Page 16: ...L80 029 Rev 5 10 07 14 ...
Page 17: ...15 L80 029 Rev 5 10 07 ...
Page 18: ...L80 029 Rev 5 10 07 16 ...
Page 19: ...17 L80 029 Rev 5 10 07 ...
Page 20: ...L80 029 Rev 5 10 07 18 ...
Page 21: ...19 L80 029 Rev 5 10 07 ...
Page 22: ...L80 029 Rev 5 10 07 20 ...