Pinnacle Treehouse Loft Assembly Manual Download Page 8

Step 37: Make sure
rafters line up at peak
with rafters on gable
end walls and down
tight against top of side-
walls.

Step 38: Secure roof
panels with three 3"
deck screws through
each outside rafter
into gable rafters.

Step 32: Secure to
floor with 3" deck
screws at 18" and
36" from inside sid-
ing of right sidewall.

Step 33: Finish
securing walls with
3" deck screws at
bottom of rafters at
each corner.

Step 34: Secure
each corner where
walls meet with five
3" deck screws.

Step 36: Position roof panels by lifting over sidewalls keeping 1 x 3's towards
the peak. Roof panels are interchangeable and will fit on either side.

Step 39: Secure bot-
toms of each rafter with
a 3" deck screw
through 2 x 6 of side-
walls up into bottom of
rafters.

Step 35: Secure poly
strip at bottom of door
opening where ply-
wood meets poly
decking with two 1"
screws.

© Pinnacle Play Systems

page 8

Summary of Contents for Treehouse Loft

Page 1: ...176 S New Holland Road Gordonville PA 17529 Tel 717 768 0804 Fax 717 768 8569 ASSEMBLY MANUAL Treehouse Loft...

Page 2: ...h and get at it the satisfaction and enjoyment of playing in this unit is only a few hours away Have Fun Remember it is very important that you have a level site for your Treehouse Loft and that the f...

Page 3: ...remove some screws that attach the floor to the shipping pallet Step 5 To start construc tion of your play set find the four 2 x 6 s that make up the base Two are 72 and two are 86 1 4 long Step 6 At...

Page 4: ...t holes in the post facing towards the back of the play set Also keep the chipped top end of each post facing to the right Step 10 When you insert posts promptly insert 1 2 x 4 3 4 carriage bolts thro...

Page 5: ...ge bolts start to sink into 2 x 6 s Step 14 When all twenty bolts are tightened the play set is ready to stand up With a person on each side stand structure upright on base Step 15 Check to make sure...

Page 6: ...1 1 4 poly capping on top of 2x6 base with 2 1 2 decking screws Keep screws about 2 from ends and about 18 apart Step 22 position 5 rung ladder at front right opening keeping top rung level with poly...

Page 7: ...m edge of poly decking Secure with two 1 pan head screws through the top of slide into poly decking Step 25 You are ready to start assembling your play house Grab back wall with no window and gable to...

Page 8: ...ring walls with 3 deck screws at bottom of rafters at each corner Step 34 Secure each corner where walls meet with five 3 deck screws Step 36 Position roof panels by lifting over sidewalls keeping 1 x...

Page 9: ...ag bolts using a 1 2 socket Position handle 2 down from top of ladder and centered on 4 x 4 s Step 45 Two pieces have a notch cut out at the bottom to fit over poly decking on loft Step 41 Secure shut...

Page 10: ...arm on ground to install two cast iron swing hangers at each end You will see how they will overlap in the middle Step 51 Secure swing hangers to bottom of swing arm with 1 2 x 6 1 2 carriage bolts th...

Page 11: ...tered on the outside studs on the back wall Step 56 Secure swing arm to back wall with four 3 8 x 4 lag bolts with washers there are two holes at each side Step 57 Install spring clips and swings on t...

Page 12: ...lumber are also known as checks and are more of a cosmetic concern than a structural concern These generally occur in large lumber such as 4x4 s and 4x6 s We have constructed this manual to assist yo...

Page 13: ...c ond coat of caulk and allow time to dry Step 4 When caulking has dried sand surface lightly with sanding pad to remove excess caulk The acrylic latex paint we use tends to stay soft and pliable Sand...

Reviews: