Pinnacle Treehouse Loft Assembly Manual Download Page 3

Step 1: This shows a wrapped swing set kit as it will
arrive to your destination.

Step 2: Start by cutting
open plastic shrink wrap;
slice all way around the
kit and then vertically at
each corner to remove
plastic.

Step 3: Remove all the parts from the kit and systematically lay them out on the
ground surface. Remove plastic wrapping from all parts.

Step 4: The last part in
the kit is the floor of the
play set; it may be
necessary to remove
some screws that attach
the floor to the shipping
pallet.

Step 5: To start construc-
tion of your play set find
the four 2 x 6's that
make up the base. Two
are 72" and two are
86-1/4" long.

Step 6: At the specific location
where you intend to erect your
play set, arrange the four pieces
as follows: the 72” piece with six
holes will be placed to the front,
the 72” piece with four holes will
be placed to the back, and the
two 86-1/4” pieces with no holes
will make up the sides of the
base. The 5/8” holes in the mid-
section of the front piece must
be left of center, to line up with
the holes in the floor.

© Pinnacle Play Systems

page 3

Summary of Contents for Treehouse Loft

Page 1: ...176 S New Holland Road Gordonville PA 17529 Tel 717 768 0804 Fax 717 768 8569 ASSEMBLY MANUAL Treehouse Loft...

Page 2: ...h and get at it the satisfaction and enjoyment of playing in this unit is only a few hours away Have Fun Remember it is very important that you have a level site for your Treehouse Loft and that the f...

Page 3: ...remove some screws that attach the floor to the shipping pallet Step 5 To start construc tion of your play set find the four 2 x 6 s that make up the base Two are 72 and two are 86 1 4 long Step 6 At...

Page 4: ...t holes in the post facing towards the back of the play set Also keep the chipped top end of each post facing to the right Step 10 When you insert posts promptly insert 1 2 x 4 3 4 carriage bolts thro...

Page 5: ...ge bolts start to sink into 2 x 6 s Step 14 When all twenty bolts are tightened the play set is ready to stand up With a person on each side stand structure upright on base Step 15 Check to make sure...

Page 6: ...1 1 4 poly capping on top of 2x6 base with 2 1 2 decking screws Keep screws about 2 from ends and about 18 apart Step 22 position 5 rung ladder at front right opening keeping top rung level with poly...

Page 7: ...m edge of poly decking Secure with two 1 pan head screws through the top of slide into poly decking Step 25 You are ready to start assembling your play house Grab back wall with no window and gable to...

Page 8: ...ring walls with 3 deck screws at bottom of rafters at each corner Step 34 Secure each corner where walls meet with five 3 deck screws Step 36 Position roof panels by lifting over sidewalls keeping 1 x...

Page 9: ...ag bolts using a 1 2 socket Position handle 2 down from top of ladder and centered on 4 x 4 s Step 45 Two pieces have a notch cut out at the bottom to fit over poly decking on loft Step 41 Secure shut...

Page 10: ...arm on ground to install two cast iron swing hangers at each end You will see how they will overlap in the middle Step 51 Secure swing hangers to bottom of swing arm with 1 2 x 6 1 2 carriage bolts th...

Page 11: ...tered on the outside studs on the back wall Step 56 Secure swing arm to back wall with four 3 8 x 4 lag bolts with washers there are two holes at each side Step 57 Install spring clips and swings on t...

Page 12: ...lumber are also known as checks and are more of a cosmetic concern than a structural concern These generally occur in large lumber such as 4x4 s and 4x6 s We have constructed this manual to assist yo...

Page 13: ...c ond coat of caulk and allow time to dry Step 4 When caulking has dried sand surface lightly with sanding pad to remove excess caulk The acrylic latex paint we use tends to stay soft and pliable Sand...

Reviews: