Pinnacle Treehouse Loft Assembly Manual Download Page 11

Step 54: Secure two sections together with 1/2" x 2-1/2"
carriage bolts through 5/8" recessed holes and install
1/2" washer, lock washer, and nuts on threads of 2-1/2"
long carriage bolts. Tighten with 3/4" socket wrench.

Step 53: Overlap swing

arm inside playhouse and
line up two 5/8" recessed
holes toward center of
swing arm.

Step 55: Line up swing
arm on back wall so
that the 1/2" recessed
holes on both sides are
centered on the outside
studs on the back wall.

Step 56: Secure swing
arm to back wall with
four 3/8" x 4" lag bolts
with washers, there are
two holes at each side.

Step 57: Install spring
clips and swings on to
swing hangers.

Congratulations, this completes the construction of your kit! Follow
manufacturer’s instructions for applying roof shingles and paint to your
liking. It will be necessary to check for splinters and screws that protrude
through surfaces during and after the entire assembly process. Be sure to
remove sharp objects and check play set periodically for loose hardware.

© Pinnacle Play Systems

page 11

Summary of Contents for Treehouse Loft

Page 1: ...176 S New Holland Road Gordonville PA 17529 Tel 717 768 0804 Fax 717 768 8569 ASSEMBLY MANUAL Treehouse Loft...

Page 2: ...h and get at it the satisfaction and enjoyment of playing in this unit is only a few hours away Have Fun Remember it is very important that you have a level site for your Treehouse Loft and that the f...

Page 3: ...remove some screws that attach the floor to the shipping pallet Step 5 To start construc tion of your play set find the four 2 x 6 s that make up the base Two are 72 and two are 86 1 4 long Step 6 At...

Page 4: ...t holes in the post facing towards the back of the play set Also keep the chipped top end of each post facing to the right Step 10 When you insert posts promptly insert 1 2 x 4 3 4 carriage bolts thro...

Page 5: ...ge bolts start to sink into 2 x 6 s Step 14 When all twenty bolts are tightened the play set is ready to stand up With a person on each side stand structure upright on base Step 15 Check to make sure...

Page 6: ...1 1 4 poly capping on top of 2x6 base with 2 1 2 decking screws Keep screws about 2 from ends and about 18 apart Step 22 position 5 rung ladder at front right opening keeping top rung level with poly...

Page 7: ...m edge of poly decking Secure with two 1 pan head screws through the top of slide into poly decking Step 25 You are ready to start assembling your play house Grab back wall with no window and gable to...

Page 8: ...ring walls with 3 deck screws at bottom of rafters at each corner Step 34 Secure each corner where walls meet with five 3 deck screws Step 36 Position roof panels by lifting over sidewalls keeping 1 x...

Page 9: ...ag bolts using a 1 2 socket Position handle 2 down from top of ladder and centered on 4 x 4 s Step 45 Two pieces have a notch cut out at the bottom to fit over poly decking on loft Step 41 Secure shut...

Page 10: ...arm on ground to install two cast iron swing hangers at each end You will see how they will overlap in the middle Step 51 Secure swing hangers to bottom of swing arm with 1 2 x 6 1 2 carriage bolts th...

Page 11: ...tered on the outside studs on the back wall Step 56 Secure swing arm to back wall with four 3 8 x 4 lag bolts with washers there are two holes at each side Step 57 Install spring clips and swings on t...

Page 12: ...lumber are also known as checks and are more of a cosmetic concern than a structural concern These generally occur in large lumber such as 4x4 s and 4x6 s We have constructed this manual to assist yo...

Page 13: ...c ond coat of caulk and allow time to dry Step 4 When caulking has dried sand surface lightly with sanding pad to remove excess caulk The acrylic latex paint we use tends to stay soft and pliable Sand...

Reviews: