Commissioning
Operating Manual PNOZ m EF SafetyNET
1004535-EN-03
| 20
Firmware
Firmware
Firmware
Firmware
Firmware
Base unit PNOZ m B1
SN p
SN p
SN p
SN p
Communication
Communication
Communication
PNOZ m EF SafetyNET
Fig.: SafetyNET p line with 5 SafetyNET p subscribers
6.5
Download modified project to the PNOZmulti system
As soon as an additional expansion module has been connected to the system, the project
must be amended using the PNOZmulti Configurator. Proceed as described in the operat-
ing instructions for the base unit.
Changes to the SafetyNET p connection have to be adapted in the software tool PNOZmulti
Network Editor.
NOTICE
For the commissioning and after every program change, you must check
whether the safety devices are functioning correctly.