62
HBC 975
EN
Use, maintenance and warning manual
SLAM-SHUT VALVE
|
COMMISSIONING
|
REV. 00
8.5 - PROCEDURE FOR COMMISSIONING THE EQUIPMENT
8.5.1 - PROCEDURE FOR CHECKING THE SLAM-SHUT VALVE FOR SEALING
4
5
6
1
V1
7.1
7.5 7.3
7.6
7.9
V2
7
Fig. 8.11.
Sealing of the HBC 975 slam-shut valve when closing
Step
Action
1
Check that the slam-shut valve (1) is in the closed position.
NOTE!
Refer to the indicator rod above the slam-shut valve.
2
Open the vent (6).
3
Drain the downstream section completely.
4
Open the upstream valve (V1).
NOTE!
Use a foaming substance to check sealing through the vent (6).
Tab. 8.38.
Summary of Contents for HBC 975
Page 1: ...HBC 975 EN Revision 00 Edition 09 2021 Slam shut valve USE MAINTENANCE AND WARNING MANUAL ...
Page 2: ...2 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE INTRODUCTION REV 00 ...
Page 4: ...4 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE INTRODUCTION REV 00 ...
Page 10: ...10 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE INTRODUCTION REV 00 ...
Page 18: ...18 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE GENERAL INFORMATION REV 00 ...
Page 63: ...63 HBC 975 Use maintenance and warning manual SLAM SHUT VALVE COMMISSIONING REV 00 EN ...
Page 70: ...70 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVE COMMISSIONING REV 00 ...
Page 148: ...148 HBC 975 EN Use maintenance and warning manual SLAM SHUT VALVES TROUBLESHOOTING REV 00 ...
Page 156: ......