![Pichler Ventech LG 150 Operating And Installation Instructions Download Page 35](http://html1.mh-extra.com/html/pichler/ventech-lg-150/ventech-lg-150_operating-and-installation-instructions_1554938035.webp)
O P E R AT I N G A N D I N STA L L AT I O N I N ST R U CT I O N S SYST E M V E N T E C H LG 5 0 0 P
PAG E 3 5
The ventilation unit LG 500 P System
VENTECH is delivered in transport
packing. The safety markings on the
packaging must be observed.
• Dimensions of the unit
(W x H x D): 915 x 855 x 720 mm
• Weight: approx. 75 kg without optional
accessories
To prevent any damage caused by force
during transport, the air compact ven-
tilation unit LG 500 P System VENTECH
must be handled with care.
Ensure that the device is not damaged
by tipping or knocking over. Theunit
must not be transported by the electri-
cal connecting cable. Avoid knocks and
blows when transporting.
The valid safety and accident regulations
have to be complied with during trans-
port. During manual transport take care
that only reasonable human lifting and
carrying forces are used.
9.2 TRANSPORT AND PACKAGING
The device must be stored in the
packaging in a suitable, dry, dust-free
room and protected against frost.
Excessive storage periods, longer than a
year, are to be avoided.
9.3 STORAGE
Care has to be taken that the packing
material and the protective packing
are disposed of in an environmentally
friendly way. The packing materials have
to be disposed of in accordance with the
local stipulations, for example, wooden
pallets and cardboard packing have to
be recycled.
Units that are no longer in
working order have to be dis-
mantled and properly disposed
of by a specialized company via suitable
collection centres and in compliance
with the waste electrical and electronic
equipment ordinance (WEEE), which pro-
vides for ratification of community law,
directive 202/95/EC (RoHS) and the di-
rective 2002/96/EC (the WEEE directive).
9.4 WASTE DISPOSAL
10 Installation
The compact ventilation unit LG 500 P
System VENTECH is to be installed in ac-
cordance with general and locally appli-
cable safety and installation regulations
and in accordance with the provisions of
these operating instructions.
The erection and installation work may
be performed only by authorized skilled
personnel.
The ventilation unit must only be set
up in a frost-free room, e.g. in a cellar
or loft, with ambient temperatures of a
minimum of +5 °C and a maximum of
+40 °C. Accumulating condensate water
must be discharged frost-free and safely
via a gradient and using an effective
drain trap (siphon).
The installation position for the de-
vice must be selected so as to allow
sufficient room to fit air line connections,
electrical connections and the condensa-
te connection (12) as well as to perform
maintenance and inspection work.
In front of the unit a free space of at
least 1 m has to be taken into considera-
tion for tending and servicing work.
An even and sufficiently hard installation
surface should be used for installing the
ventilation unit. The ventilation unit can
also be mounted on a solid wall, capable
of supporting the device weight, using
the wall-mounting bracket supplied as
standard. In doing so sufficient dimen-
sioning (structural analysis) of the load-
bearing components has to be ensured.
10.1 PREREQUISITES FOR
INSTALLATION OF THE UNIT