
Intermediate step - black key
After pulling out the red key, insert the black key within 10 seconds and promptly turn
it to "
ON
". After 1-3 seconds, turn the key to "
OFF
" again and pull it out. In this way,
a maximum of 7 black keys can be programmed by repeating the above procedure
keeping the indicated times.
Final step - red key
After pulling out the last black key, insert the red key again and turn it to "
ON
" (this
operation should be performed within 10 seconds of pulling out the previous key).
Leave it in this position for 1 to 3 seconds and return it to the «
OFF
» position.
Proper programming check
Insert the red key disabling the transponder (i.e., tilt the key cap by 90°) and turn the
key to "
ON
". Perform the engine start-up operation. Ensure that the engine does not
start. Insert the black key and repeat the start-up operation. Check that engine starts.
WARNING
SHOULD THE ENGINE START WITH THE RED KEY (WITH TRANSPONDER OFF),
OR IN THE EVENT OF WRONG OPERATION DURING PROGRAMMING, REPEAT
THE PROCEDURE FROM THE BEGINNING.
19
1 Vehicle
Summary of Contents for Beverly Tourer 250 i.e.
Page 4: ...4...
Page 7: ...BEVERLY Cruiser 250ie Chap 01 Vehicle 7...
Page 8: ...01_01 8 1 Vehicle...
Page 10: ...01_02 10 1 Vehicle...
Page 22: ...01_17 01_18 01_19 22 1 Vehicle...
Page 26: ...26 1 Vehicle...
Page 27: ...BEVERLY Cruiser 250ie Chap 02 Use 27...
Page 39: ...BEVERLY Cruiser 250ie Chap 03 Maintenance 39...
Page 63: ...03_30 03_31 03_32 63 3 Maintenance...
Page 73: ...BEVERLY Cruiser 250ie Chap 04 Technical data 73...
Page 74: ...04_01 74 4 Technical data...
Page 79: ...BEVERLY Cruiser 250ie Chap 05 Spare parts and accessories 79...
Page 82: ...82 5 Spare parts and accessories...
Page 83: ...BEVERLY Cruiser 250ie Chap 06 Programmed maintenance 83...