
Check the power supply line of the injection load
solenoid energising coil: after switching to «ON»,
make sure there is battery voltage, for 2 seconds,
between the Red-White cable and the Black-Pur-
ple cable of the solenoid base. If there is not, check
the continuity of the Red-White cable between the
fuse box and the solenoid base and of the Black-
Purple cable between the pin 20 of the control unit
and the solenoid base.
N.B.
CONTINUITY TESTS MUST BE CARRIED OUT WITH THE
COMPONENTS DISCONNECTED. (SOLENOIDS, CON-
TROL UNIT, FUSES ETC.).
Injection
Beverly Tourer 300 i.e.
INJEC - 186
Summary of Contents for Beverly 300 i.e.
Page 4: ......
Page 6: ...INDEX OF TOPICS CHARACTERISTICS CHAR...
Page 29: ...INDEX OF TOPICS TOOLING TOOL...
Page 40: ...INDEX OF TOPICS MAINTENANCE MAIN...
Page 53: ...INDEX OF TOPICS TROUBLESHOOTING TROUBL...
Page 57: ...INDEX OF TOPICS ELECTRICAL SYSTEM ELE SYS...
Page 65: ...Beverly Tourer 300 i e Electrical system ELE SYS 65...
Page 108: ...INDEX OF TOPICS ENGINE FROM VEHICLE ENG VE...
Page 115: ...INDEX OF TOPICS ENGINE ENG...
Page 162: ...Engine Beverly Tourer 300 i e ENG 162...
Page 170: ...INDEX OF TOPICS INJECTION INJEC...
Page 210: ...INDEX OF TOPICS SUSPENSIONS SUSP...
Page 240: ...INDEX OF TOPICS BRAKING SYSTEM BRAK SYS...
Page 254: ...INDEX OF TOPICS COOLING SYSTEM COOL SYS...
Page 260: ...INDEX OF TOPICS CHASSIS CHAS...
Page 275: ...INDEX OF TOPICS PRE DELIVERY PRE DE...
Page 279: ...INDEX OF TOPICS TIME TIME...