Phonocube PC3.0A1-S User Manual Download Page 5

05

06

Figure 3.3-1

Mounting location should be selected based on the following aspects:

● 

The installation method and mounting location must be suitable for the inverter's weight and   

    dimensions.

● 

Mount on a solid surface.

● 

Select a well ventilated place sheltered from direct sun radiation.

● 

Install vertically or tilted backward by max 15°. The device cannot be installed with a sideways tilt. The connection area must point 

downwards. Refer to Figure 3.3-1.

3.3 Selecting The Mounting Location

● 
● 

For the convenience of checking the LED lights and possible maintenance activities, please install the inverter at eye level.

● 

Inverters should NOT be installed near inflammable and explosive items. Any strong electro-magnetic equipment should be kept 

away from installation site.

● 

Product label and warning symbol shall be clear to read after installation.

● 

Please avoid direct sunlight, rain exposure, snow lay up when install.

In order to achieve optimal performance, the ambient temperature should be lower than 45 °C.

Direct

 

Sunlight

Rain

 

Exposure

Snow

 

Lay

 

up

No

 

direct

 

sunlight

No

 

Rain

 

Exposure

No

 

Snow

 

Lay

 

up

3.1 Packing List

3 Installation 

Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. You should have received the 
following items inside of package:

Max

15

°

Wall-mounted 

Bracket

×

1

Inverter

×

1

Positive DC Plug

×

2

or

Negative DC Plug

×

2

or

Battery

 

cover × 1

Pcmeter & CT × 1

Battery terminal × 2

User Manual

×

1

User

manual

Quick Installation Guide

×

1

Wi-Fi Configuration

×

1

Wi-F

Configuration

Instruction

 of 

Fast 

Installation

Expansion Bolts

×

6

Hexagon

 

head

 

screw × 2

Pan

 

head

 

screw × 6

Waterproof terminal × 2

3.2 Product Overview

1

 

2

 

3

 

4

 

5

 

6

 

7

 

1. 
2. Battery

 

input

 

terminals

3. Wi-Fi Box port
4. Communication port
5. Back

-

Up

 

port

6. On

-

Grid

 

port

   

7. DC Switch (Optional)
8. LED Lable

8

 

PE terminal × 1

PV input terminals

2

Phonocube Instruction

 ×

1

Phonocube 

Instruction

 

Summary of Contents for PC3.0A1-S

Page 1: ...340 00xxx 00 PC...

Page 2: ...DRED Connection 4 8 Earth Fault Alarm 18 19 24 25 28 17 17 4 9 20 9 Trouble shooting 4 11 special backup application 28 13 Maintenance 2 3 Special illustration 03 07 06 05 16 16 16 15 17 15 14 13 11...

Page 3: ...nd never be tipped over or slung 2 2 Safety Installation maintenance and connection of inverters must be performed by qualified personnel in compliance with local electrical standards wiring rules and...

Page 4: ...ack up supply will be waken again 2 3 3 Battery protection d For lead acid batteries connecting with Hybrid inverter the SOC is calculated on inverter side As lead acid battery has various brands and...

Page 5: ...on Please avoid direct sunlight rain exposure snow lay up when install In order to achieve optimal performance the ambient temperature should be lower than 45 C Direct Sunlight Rain Exposure Snow Lay...

Page 6: ...8 Positive shall be red negative shall be black ToB attery To Battery communication cable To PCmeter communication cable House Grid 200mm 200mm Both sides 200mm 07 Phonocube To PCmeter Pcmeter PCmeter...

Page 7: ...4 1 3 Negative connector Positive connector Inverter Special tools are used to stitching MC4 series AMPHENOL series Limit buckle can t crimping the wire 63 The terminal can be connected to earth wire...

Page 8: ...as the PE line is longer than L and N Neutral conductor shall be blue line conductor shall be black or brown preferred protective earth bonding line shall be yellow green Note 2300VA 25A 30mA 1 1 5 In...

Page 9: ...by remove the communication cover then put the communication cover back and install the waterproof terminal The To Meter communication cable attached on inverter can be extended to max 100m but for t...

Page 10: ...is successful Refer to Figure 4 7 1 4 7 DRED Connection 1 DRED connection is only available for Australia and New Zealand 2 Supported DRM command DRM0 DRM1 DRM2 DRM3 DRM4 DRM5 DRM6 DRM7 DRM8 4 9 Syst...

Page 11: ...p For the detailed operation of this function please check instructions on Phonocube App 6 CEI Auto Test Power limit function Introduction 17 18 1 2 3 SP3T 1 Loads is supplied from back up side 2 Load...

Page 12: ...m CT PCmeter connection direction BMS Communication Checking details 1 Check if the COM led on PCmeter triple blinking or not 2 Or connect Solar Wifi check in Phonocube App Parameters if PCmeter COM s...

Page 13: ...n Battery charge discharge Check items 1 Check if there is a fluctuation on load power 2 Check if there is a fluctuation on PV power on Portal If everything is OK please contact after sales Services C...

Page 14: ...tery is 48V max charge voltage 60V 3 For example serial connection of 4 12V 100Ah lead acid battery the capacity will still be 100Ah An error message will be displayed on the APP if a fault occurs Tab...

Page 15: ...Overvoltage Category External Environment Pollution Degree Cooling Noise dB User Interface Communication with BMS Communication with Meter Weight kg Size Width Height Depth mm Mounting Output THDv li...

Page 16: ...main distribution board Examples are switchgear and other equipment in an industrial installation Category IV applies to equipment permanently connected at the origin of an installation upstream of t...

Reviews: