![Phoenix Advanced pressure monitor II Installation Manual Download Page 26](http://html.mh-extra.com/html/phoenix/advanced-pressure-monitor-ii/advanced-pressure-monitor-ii_installation-manual_1551260026.webp)
22
MKT-0262 MPC-1748 Rev 02/13
APM2 Central Display Rough-In Installation
Wiring
3.4 Wiring
Figure 3-3.
Rear View of the APM2 Central Display
S
howing Wiring Connections
The back of the APM2 Central Display has electrical connectors labeled with their function. The mating
electrical connectors (supplied) are color coded and labeled with the matching function.
3.4.1 Power, Labeled POWER, L1, L2, Ground Symbol
Starting with the 3 pin Power connector:
1. Connect the 24 Vac lines to L1 and L2.
2. Connect a ground wire, GND, from the ground lug to the GND on the connector.
3. Install Connector.
The APM2 operates at 18-32 Vac, 50/60 Hz and consumes 2.6 W nominal, 9.6 W max.
Earth Ground
L1
24
Vac
L2
24
Vac
POWER
COMM
B (+)
A (-)
GND
REAR VIEW
BACnet Commun
ica
t
i
ons
(See Detail A)
DATA +
DATA -
COMM
B (+)
GND
A (-)
DETAIL "A"
GROUND SHIELD - ONE END ONLY