96
96
12.2 MCU F/W upgrade
1. Tool and Cable
1) An i486 (or above) personal computer or compatible.
2) Microsoft operation system Windows 95/98/2000/XP.
3) USB Driver and ISP tool “MCU_ISP_SETUP_0.92.exe” program.
4) USB cablex1, VGA cablex1
5) ISP Board: 715GT183-A
6) Philips PD
2. Connecting the monitor to the PC
3. Installation of USB board driver.
1) Connect the PC, tool and PD.
2) When the ISP tool connected to PC first time, it will pop up hardware installation wizard to instruct.
USB Cable
715GT183-A
Summary of Contents for BDL4245E/00
Page 35: ...35 5 Block Diagram 5 1 Scaler Board ...
Page 78: ...78 78 3 Remove all the screws as follow ...
Page 79: ...79 4 Remove the main frame from the panel ...
Page 83: ...83 3 Remove all the screws as follow ...
Page 84: ...84 84 4 Remove the main frame from the panel ...
Page 89: ...89 3 Set the parameters as below figure ...
Page 91: ...91 6 Click Commands batch to load the file isp_psi_ext txt ...
Page 95: ...95 ...
Page 97: ...97 ...
Page 100: ...100 100 5 Click Auto to upgrade 6 Update processing ...
Page 137: ...137 ...
Page 138: ...138 138 15 Monitor Exploded View ...
Page 139: ...139 ...
Page 140: ...140 140 ...