136
136
14. White Balance, Luminance Adjustment
Equipment:
PC x 1, Chroma2325 (or equivalent instrument), CA-210 x 1, W/B record card x 1
Equipment installation:
1. Connect analyzer CA-210 to PC by USB connector, install driver program CA-SDK Ver4.00 for CA-210 and
restart PC after finish installing
2. Install Port95NT drive program, set PC printer connector mode as ECP mode and restart PC after finish installing.
3. Connect tool as follow:
Preparation before adjustment:
a. Monitor should be warmed up for more than half an hour.
b. Make sure that the tools are connected right and drive programs have been installed OK.
c. Connect the signal cable, barcode reader, and connected card.
Adjustment processes
a. Press the power of CA-210, shut off the lens, press 0-Cal and open the lens after analyzer reset.
b. Open white balance adjustment program, select the right parameter according with the program and click OK.
c. Make sure that the lens of CA-210 aims at the center of the screen, then click START to adjust.
d. After finish adjusting, the adjustment program displays pass, and the START button changes for NEXT, which
means that you can adjust another monitor.
To PC LPT
+12V DC power
Testing monitor
Chroma Equipment
Summary of Contents for BDL4245E/00
Page 35: ...35 5 Block Diagram 5 1 Scaler Board ...
Page 78: ...78 78 3 Remove all the screws as follow ...
Page 79: ...79 4 Remove the main frame from the panel ...
Page 83: ...83 3 Remove all the screws as follow ...
Page 84: ...84 84 4 Remove the main frame from the panel ...
Page 89: ...89 3 Set the parameters as below figure ...
Page 91: ...91 6 Click Commands batch to load the file isp_psi_ext txt ...
Page 95: ...95 ...
Page 97: ...97 ...
Page 100: ...100 100 5 Click Auto to upgrade 6 Update processing ...
Page 137: ...137 ...
Page 138: ...138 138 15 Monitor Exploded View ...
Page 139: ...139 ...
Page 140: ...140 140 ...