19” CDT Color Monitor 109B7
25
6. Mechanical Instructions
0. General
To be able to perform measurements and repairs on the "circuit boards", these unit should be placed
in the service position first.
1. Remove the rear cover
Remove 6 screws as shown in Fig. 1 and Fig. 2
2. Video board
Remove the main frame as show in Fig. 3
Disconnect the adhesive tape and ground pins
between metal shield of Video board and main
board as shown in Fig. 4 to Fig. 7
Cut the tie between the CRT neck and the video
board as shown in Fig. 8
Fig. 1
Fig. 5
Fig. 6
Fig. 4
Fig. 2
Fig. 3
Summary of Contents for 109B7
Page 21: ...19 CDT Color Monitor 109B7 21 Step 5 Enter into Fig 8 Fig 8 Step 6 Enter into Fig 9 Fig 9 ...
Page 35: ...19 CDT Color Monitor 109B7 35 8 Mechanical of Cabinet Front Dis Assembly ...
Page 58: ...19 CDT Color Monitor 109B7 58 11 Block Diagram ...
Page 60: ...19 CDT Color Monitor 109B7 60 SAA4849 ...
Page 64: ...19 CDT Color Monitor 109B7 64 13 PCB Layout 13 1 Main Board PCB layout ...
Page 65: ...19 CDT Color Monitor 109B7 65 13 2 CRPC Board Layout ...