EN - 6
02/2014
Copyright © 2014, Fast ČR, a. s.
Before starting the installation
•
Check that the purchased appliance has the correct dimensions corresponding to the chosen installation
location. Furthermore ensure that there is an electrical power socket available that will remain accessible
even after the range hood is installed.
•
Before installing the range hood, check that all necessary masonry work is complete.
•
Have all electrical connections performed by a qualifi ed person.
•
We recommend that you remove the aluminium fi lters before installing the range hood.
•
Check that there are no packaging materials or other materials, e.g. user's manual, warranty card or bags
with screws, inside the appliance. These need to be taken out and kept for possible use in the future.
•
We recommend that you disconnect and move to the side freely standing or built in stoves so that you
have easier access to the rear wall or ceiling. If this is not possible place protective material on to the work
area, cooktop or stove. This will prevent damaging these surfaces.
•
Select an even surface for the necessary assembly of the range hood. Cover the surface with a protective material
and place all parts of the range hood and fastening elements on to it.
•
It is necessary that a qualifi ed technician inspects the suitability of the supplied fastening material and
other components for the specifi c wall / ceiling type. The wall / ceiling must be suffi
ciently strong to hold
the weight of the range hood.
•
Do not attach this range hood to a wall or cabinet furniture by tiling, plastering and do not glue it on using
silicone glue. The appliance is designed to only be installed on a wall / ceiling.
•
We recommend that always two people perform the installation of the appliance.
If your range hood is designed to be mounted to the ceiling, adhere to the following instructions.
1) The range hood must only be suspended on ceiling beams or on load bearing ceiling beam connections.
2)
Do not suspend
the range hood on false ceilings.
3) The
ceiling
must
have a load bearing capacity of at least 40 kg
4) The ceiling thickness
must
be at least 30 mm.
IMPORTANT:
THE RANGE HOOD MAY ONLY BE CONNECTED TO THE ELECTRICAL GRID AFTER THE ENTIRE INSTALLATION
IS COMPLETE.
Supplied accessories (depending on the model)
A non-return exhaust fl ap must be installed into the air outlet of the range hood (unless one is already factory
installed).