7
SHIFT 2
SHIFT 2 air
GETTING STARTED
PREPARATIONS
•
The Evolv Shift 2 case is designed to support installation in a standing position.
•
Don’t turn on the power to your system until installation is complete.
•
Discharge your body’s static electric charge by touching a grounded surface before performing any hardware procedure.
•
Make sure to consult the manuals of your hardware before installation.
RECOMMENDED INSTALLATION PROCESS
A unique chassis design like the Shift 2 (air) comes with a different approach to the installation process.
That is why we recommend to follow these installation tips:
- Follow the component installation order as shown in this manual.
- Pre-route the cables for each installed component as shown at each step.
- Wait with connecting cables until the end of the installation process.
Depending on hardware components such as power cable length the cable routing can be different.
1. INSTALL COMPONENT
2. P RE-ROUTE C ABLES
TO THE OUT SIDE
3. CONNECT ALL C ABLES AT THE END
OF THE INSTALL ATION P ROCESS
Summary of Contents for EVOLV SHIFT 2
Page 1: ...U S E R M A N U A L V 1 0 SHIFT 2 SHIFT 2 air ...
Page 2: ......
Page 3: ...Thank you f o r c h o o s i n g ...
Page 30: ......