Operating Instructions
MILOMAT
laboratory mill
© 2017 Pfeuffer GmbH
Revision 1
Page 15 of 32
Transport to the installation site (by the customer)
4.4
The transport is only allowed to be untertaken by specialist personnel according to the
local conditions and any information indicated on the packaging material.
Unpacking
To avoid damage to the housing and other components,
open the packaging
remove the packaging elements
lift the MILOMAT carefully out of the box
note that the unit weighs 10 kg
move the MILOMAT to the installation location, see
chapter 5.1.
Keep the original packaging in case you need to send the equipment back.
Packaging for return delivery
If possible, use the original packaging and the original packaging material. If neither is available any
longer, request new packaging from Pfeuffer GmbH.
5
Installation and commissioning
The installation and commissioning chapter is only intended for
specialist operators.
Installation
5.1
Carefully unpack the laboratory mill MILOMAT (see
chapter 4.4
Place the MILOMAT level on a solid table with a smooth and clean surface.
Make sure there is an adequate distance to all sides so that no heat buildup can occur.
Do not set up the MILOMAT close to apparatus/devices that are sensitive to dust.
Avoid exposure to direct sunlight and extreme ambient conditions.
Make sure that the installation height is ergonomic according to the stature of the operating
personnel.
Connect the supplied mains cable to the MILOMAT using the connector (C19/C20 coupler).
Connect the plug of the mains cable to a suitably earthed socked with protective earth
conductor.
Take the MILOMAT into operation according to the instructions in
chapter 7
.