Operating instructions

BA 28y-01_EN

Edition June 2004

Ö

 

The connecting specifications for the actuator unit must match those of the control equipment. See nameplate(s) on the actuator
unit.

Ö

 

Make sure the end connections of the pipeline are aligned with the piggable ball valve’s end connections and their ends have
parallel planes.

Ö

 

Prior to installation, carefully clean the valve and the connecting section of the pipeline from dirt, especially hard foreign material.

Ö

 

The valve can be installed in any position. However, if possible, the actuator should not be located directly underneath the
piggable ball valve.

Ö

 

Make sure the arrow on the valve body corresponds with the direction of flow in the pipeline.

Note

In special cases, it may be necessary for the valve to be tightly shut against the direction of flow. The installation in such
special cases 

must be determined by the operator of the pipeline

 (e.g. to protect a pump).

Ö

 

On inserting the valve (and any flange gaskets) into a ready mounted pipeline, keep a certain clearance between the pipeline
ends to ensure that all facings (and gaskets) remain undamaged.

Ö

 

The associated instructions apply for connecting the actuator unit to the control equipment.

Ö

 

After completing installation, carry out a function check using the signals issued by the control equipment. The valve must open
and close properly corresponding with the control signals. Any function errors that are recognized must be remedied before
commissioning. See also section 7 <Troubleshooting>.

Warning

Control commands that are not carried out correctly 

may result in personal injury and can damage equipment

installed in the pipeline.

5

Pressure check in pipeline section

The pressure check of valves has already been carried out by the manufacturer. To check the pressure of a section of pipeline with
installed valves, the following points must be observed:

Ö

 

Carefully flush newly installed pipes to remove any foreign material.

Ö

 

Valve OPEN:

 The test pressure should not exceed the value 

1.5 x PN

 (see nameplate).

Ö

 

Valve CLOSED:

 The test pressure should not exceed the value 

1.1 x PN

 (see nameplate).

If a valve leaks, see section 7 <Troubleshooting>.

Standard operation and maintenance

Operate the valve/actuator unit over the control equipment signals. Piggable ball valves delivered with the actuator already mounted are
precisely set and should not be readjusted.

The shaft is sealed with a V-ring packing preloaded with a set of spring washers and does not require any maintenance.

Normal manual force is sufficient to operate the manual override on the actuator (if required). It is not permissible to use extensions to
increase the operating torque.

Regular maintenance work on the piggable ball valves is not necessary. But, on checking the pipeline section, there should be no
leakage at the flanged and bolted connections of the valve body or at the shaft packing. If a valve leaks, proceed as described in section
7 <Troubleshooting>.

Summary of Contents for 28z Series

Page 1: ...en installed from both sides in the pipeline and a risk of injury can be ruled out For piggable ball valves which are intended for dead end service see section 2 3 Applied standards AD 2000 Regulation...

Page 2: ...on 3 1 Intended use 3 2 Safety instructions 3 2 1 General safety instructions 3 2 2 Safety instructions for the operator 3 2 3 Particular hazards 4 2 4 Designation of the piggable ball valve 4 3 Trans...

Page 3: ...metallic parts in hazardous areas Observe the restrictions in the specified data sheets if the piggable ball valve is intended for throttling services The piggable ball valve body may contain small am...

Page 4: ...emaining media that may still be in the pipeline or have collected in the cavities of the valve Warning Only unscrew or loosen any screws or bolts connecting the body parts after the valve has been re...

Page 5: ...uating device is set for the operating data specified in the order Do not alter the settings for the final positions OPEN and CLOSED without the manufacturer s prior consent Warning Only for piggable...

Page 6: ...lve must open and close properly corresponding with the control signals Any function errors that are recognized must be remedied before commissioning See also section 7 Troubleshooting Warning Control...

Page 7: ...valve observing the instructions in section 2 3 Particular hazards and check it If the valve is damaged If it must be repaired remove the valve observing section 2 3 Particular hazards Contact Pfeiff...

Page 8: ...Pfeiffer Chemie Armaturenbau GmbH Hooghe Weg 41 47906 Kempen Phone 02152 2005 0 Fax 02152 1580 Page 8 of 8 Operating instructions BA 28y 01_EN Edition June 2004...

Reviews: