background image

Pfeiffer Chemie-Armaturenbau GmbH
Hooghe Weg 41  •  47906 Kempen
Phone 02152 2005-0  •  Fax 02152 1580

Page 7 of 8

Operating instructions

BA 28y-01_EN

Edition June 2004

7 Troubleshooting

Observe the safety instructions listed in section 2 on troubleshooting.

Warning

To remove a valve from a pipeline containing dangerous media and to take it out of the plant:

Decontaminate the valves properly first.

Type of fault

Action to be taken

Comment

Leak at the
connection to the
pipeline

Tighten flange bolts.

If the medium leaks out at the flanges even after tightening the flange bolts:

Remove the valve (observing the instructions in section 2.3 <Particular hazards>) and
replace the gaskets.

Leak at the
connection
between valve
body parts

Tighten bolts/screws with a torque wrench, see Pfeiffer repair instructions
<EB28a_EN or EB28a/x_EN

If the valve still leaks:

Remove the valve (observing the instructions in section 2.3 <Particular hazards>) and
replace the gaskets. Contact Pfeiffer for spare parts and necessary instructions.

Leak at the shaft
packing

Remove the valve (observing the instructions in section 2.3 <Particular hazards>),
dismantle the valve and replace the shaft packing. Contact Pfeiffer for spare parts
and necessary instructions.

No tight shut-off
when the valve is
closed

Remove the valve (observing the instructions in section 2. 3 <Particular hazards >)
and check it.

If the valve is damaged:

If it must be repaired, remove the valve, observing section 2.3 <Particular hazards>.
Contact Pfeiffer for spare parts and necessary instructions.

Malfunction

Check actuator unit and control signals

If actuator and control equipment are in order:

Remove the valve (observing the instructions in section 2.3 <Particular hazards>) and
check it.

If the valve is damaged:

If it must be repaired, remove the valve, observing section 2.3 <Particular hazards>.
Contact Pfeiffer for spare parts and necessary instructions.

If a pneumatic
actuator with
springs must be
removed from the
valve

Caution: Risk of injury

Before removing the actuator from the valve, disconnect the signal pressure.

Note 1:

When ordering spare
parts, include all the
specifications listed in the
valve designation. Only
use original parts from
Pfeiffer.

Note 2:

If, after removing the
valve from the pipeline, it
is found that the body
and/or internal parts are
not sufficiently resistant to
the process medium,
select parts made of a
suitable material.

For malfunctioning actuator units, refer to the actuator instructions.

8 Further 

information

Contact the address below for the listed <Data sheets> and <Repair instructions> as well as further information.

Pfeiffer Chemie-Armaturenbau GmbH

Hooghe Weg 41   

   47906 Kempen

Phone: +49 21 52 20 05 - 0   

   Fax +49 21 52 15 80

E-Mail: [email protected]   

   Internet: www.pfeiffer-armaturen.com

Summary of Contents for 28z Series

Page 1: ...en installed from both sides in the pipeline and a risk of injury can be ruled out For piggable ball valves which are intended for dead end service see section 2 3 Applied standards AD 2000 Regulation...

Page 2: ...on 3 1 Intended use 3 2 Safety instructions 3 2 1 General safety instructions 3 2 2 Safety instructions for the operator 3 2 3 Particular hazards 4 2 4 Designation of the piggable ball valve 4 3 Trans...

Page 3: ...metallic parts in hazardous areas Observe the restrictions in the specified data sheets if the piggable ball valve is intended for throttling services The piggable ball valve body may contain small am...

Page 4: ...emaining media that may still be in the pipeline or have collected in the cavities of the valve Warning Only unscrew or loosen any screws or bolts connecting the body parts after the valve has been re...

Page 5: ...uating device is set for the operating data specified in the order Do not alter the settings for the final positions OPEN and CLOSED without the manufacturer s prior consent Warning Only for piggable...

Page 6: ...lve must open and close properly corresponding with the control signals Any function errors that are recognized must be remedied before commissioning See also section 7 Troubleshooting Warning Control...

Page 7: ...valve observing the instructions in section 2 3 Particular hazards and check it If the valve is damaged If it must be repaired remove the valve observing section 2 3 Particular hazards Contact Pfeiff...

Page 8: ...Pfeiffer Chemie Armaturenbau GmbH Hooghe Weg 41 47906 Kempen Phone 02152 2005 0 Fax 02152 1580 Page 8 of 8 Operating instructions BA 28y 01_EN Edition June 2004...

Reviews: