Table of contents
1
1.1
1.1.1 Applicable documents
1.1.2 Variants
1.2
1.3
1.3.1 Instructions in the text
1.3.2 Pictographs
1.3.3 Stickers on the product
1.3.4 Abbreviations
2
2.1
2.2
2.3
2.4
ATEX classification and safety measures
2.4.1 Labeling of the vacuum pump
2.4.2 Potential hazards
2.4.3 Safety measures
2.5
2.6
2.7
2.8
2.8.1 Ensuring personnel qualification
2.8.2 Personnel qualification for maintenance and repair
2.8.3 Advanced training with Pfeiffer Vacuum
3
3.1
3.2
3.3
3.4
4
4.1
4.2
5
5.1
5.2
5.3
5.4
5.5
5.5.1 Choosing the cable bushing
5.5.2 Connect three phase motor with 6-pin terminal board
5.5.3 Selecting on-site fuse protection
5.5.4 Connecting the PTC thermistor tripping unit
5.5.5 Checking the direction of rotation
5.6
6
6.1
Putting the vacuum pump into operation
6.2
6.3
Operating the vacuum pump with inert gas
6.4
6.5
Table of contents
3/58