
Setting up
9 - 1
9
Setting up
All setting-up work must only be carried out by appropriately trained
personnel!.For all setting-up work , the machine must be disconnected by
pulling out the mains switch.
9
.01
Inserting the sealing tape
9
.01.01
Adjusting the tape reel bracket to the diameter of the tape reel core
Fig. 9 - 01
3
2
1
●
The tape reel bracket must be adjusted to the diameter of the tape reel core:
●
For large core diameters ring
1
and washer
2
must be fitted,
for small core diameters the fitted holder
3
is sufficient.
When rolling off the reel, the sealing tape must not touch the inner wall of the
tape reel bracket
Fig. 9 - 02
From
the
library
of:
Diamond
Needle
Corp