
12
4
Machine installation
Note:
In case of damage due to transportation inform the transportation company and the
respective PFAFF agency.
.1
Lift machine off the transportation pallet by means of a fork lifter.
.2
Turn the six rubber buffer elements delivered with the accessories (fig. 1) into feet 2.
.3
Lower machine down on the floor and adjust it horizontally by shifting feet 2.
.4
Connect stacker stand 3 (fig. 2) on the front side of the machine.
Check hook lubrication by all means (see section 8.2) on machines that are put into operation
for the first time or that have not been used for a longer period (approx. 2 to 3 months).
5
Connecting for compressed air and electricity
5.1
Compressed air
Connect compressed air tube (inner diameter 6 mm) to coupling 4 (fig. 3).
Minimum network pressure:
7 bar
Working pressure:
6 bar
Pressure regulation:
Valve 5
5.2
Electricity
.1
Permissible operating voltage is indicated in box 6 (fig. 4).
.2
Connection is permissible only if mains and operating voltage are the same.
.3
Machine must only be connected to an earthed plug.
Summary of Contents for 3568-12/12
Page 1: ...3568 2 12 12 12 Instruction manual 296 12 17 360 Betriebsanleitung engl 01 94...
Page 6: ...6...
Page 10: ...10...
Page 13: ...13 4 1 1 2 3 4 5 3 2 6 ABB_04_01 TIF ABB_16 TIF Wart cdr...
Page 15: ...15 1 3 2 1 Wart cdr 1 ABB_10 TIF 4 Pult01_68 EPS 5 2 4 3 4 HS_off cdr HS_on cdr CLOSED OPEN...
Page 21: ...21 1 2 3 3 4 5 6 7 ABB_02_02 TIF 2 1 ABB_06_01 TIF ABB_05 TIF...
Page 23: ...23 4 3 2 1 3 ABB_02_02 TIF ABB_04 TIF 2 1 SPUL_12 TIF...
Page 25: ...25 3 1 2 1 2 ABB_04 TIF ABB_06_01 TIF...
Page 45: ...45 1 1 einlege cdr...
Page 49: ...49 5 7 7 8 Max Water level 6 Wart cdr...
Page 51: ...51 12 13 10 12 filter cdr ABB_02_02 TIF 11 9 ABB_26_03 TIF 8 9...