
Operation Manual AM 5200 (-A) E5200EN3 v 1.1 May 2013
14 (36)
7.3
Analyzing Samples
7.3.1
Preparations
This Section describes necessary preparations required to begin analysis.
Step Action
Description
Illustration/Picture
1
Switch the instrument
on.
The AM 5200 (-A)
automatically starts a self-test
when the instrument is
switched on. The instrument is
off when the bottom of the
button is pressed and on when
the top is pressed.
2
Empty and insert catch
drawer.
The catch drawer must be
emptied and inserted before
analysis can begin. A reminder
is displayed when the
instrument has completed the
self-test.
3
Prepare the sample.
Approximately 700 ml of
sample is required.