Rev 02, 09/21
Perma Pure LLC
• A Halma Company • [email protected] • www.permapure.com
Telephone: 7
32-244-
0010 • Toll Free: 800
-337-
3762 • Fax:
7
32-244-8140
1
001 New Hampshire Ave.,
L
akewood, NJ 08701 USA
8.2.5
Grounding Lug
Verify that the system is properly grounded.
SHUTDOWN
PROCEDURE
•
Turn OFF the sample pump.
•
Turn OFF
instrument
air supply
DOS
&
DON’TS
•
DO NOT pass sample gas through the system if the
instrument
air supply to the system is off.
•
DO NOT clean PD sample gas dryer with high pressurized
instrument
air or other gas.
•
DO NOT operate the system with the drain or purge exhaust vent lines disconnected.
•
DO NOT operate the system in an ungrounded condition (ground lug not connected)
•
DO visually inspect the condition of sample filters and any customer installed filters regularly.
•
DO regularly check the PD dryer purge vacuum and flow settings.
•
DO contact a Perma Pure representative with any question you may have about the operation
of the system.
MAINTENANCE
AND
REPAIR
11.1
O
PERATIONAL ADJUSTMENTS
If at any time the system is not operating correctly, the system adjustments should be checked for their proper
setting. Refer to the Q.C. checklist for proper adjustment settings and procedures.
11.2
S
AMPLE
F
ILTER
Sample gas flow through the filter is inside to outside. The filter is plumbed in this way to allow for proper
coalescing operation. Because of the flow direction, it may appear that filter element is relatively clean when